April 25, 2025

25 Apr 2025
  • Black Cat Road is closed north of Ustick Road.
  • Black Cat Road is open south of Ustick Road.
  • Aspenstone Street is closed at Black Cat Road.
  • Ustick remains open: Traffic has been shifted onto the temporary asphalt on the south side of Ustick – one lane in each direction.
  • Irrigation and seepage bed installation is ongoing.
  • Roadway and sidewalk demo and prep are ongoing on the north side of Ustick.
  • Eight Mile irrigation: Irrigation is complete for the season. Irrigation work, apart from Nine Mile, is nearly complete in preparation for the City’s sewer bypass.
  • Rutledge has been sleeved for sewer line install.
  • Contractor is continuing site prep and demo on N Black Cat – asphalt has been removed up to Aspenstone.