December 12, 2024
- Contractor completed the milling of the south half of the road in preparation for utility relocations and temporary pavement.
- Temporary asphalt will be placed this week for the new traffic pattern on the south side of Ustick.
- Irrigation and seepage bed install ongoing.
- Roadway and sidewalk demo ongoing.
- Eight Mile irrigation box on Black Cat has been demolished.
Share December 12, 2024 on Facebook
Share December 12, 2024 on X (formerly Twitter)
Share December 12, 2024 on Linkedin
Email December 12, 2024 link
This project is substantially complete.