December 20, 2024

  • Black Cat Road is closed south of Ustick Road.
  • Temporary asphalt for the new traffic pattern on the south side of Ustick complete.
  • Traffic will shift this week.
  • Irrigation and seepage bed install ongoing.
  • Roadway and sidewalk demo and prep ongoing.
  • Eight mile irrigation box on Black Cat has been demolished.
Share December 20, 2024 on Facebook Share December 20, 2024 on X (formerly Twitter) Share December 20, 2024 on Linkedin Email December 20, 2024 link

This project is substantially complete.