December 4, 2025

  • Irrigation and seepage bed installation is nearly complete.
  • Eightmile and Ninemile irrigation: Irrigation work is ongoing at both Eightmile and Ninemile. Curb, gutter and sidewalk placements ongoing on the south side of Ustick.
  • Patterned concrete median islands are being placed east of Black Cat.
  • Asphalt paving portions of the north and south side of Ustick complete. City of Meridian sewer and water line installation complete – service tie-in to SE property still pending. Concrete paving south side of Ustick and Black Cat intersection is nearly complete.
  • After the irrigation work and water/sewer tie-in is complete, concrete paving of S. Black Cat will resume.
Share December 4, 2025 on Facebook Share December 4, 2025 on X (formerly Twitter) Share December 4, 2025 on Linkedin Email December 4, 2025 link

This project is substantially complete.