February 12, 2026
- Black Cat remains closed south of Ustick Rd.
- Concrete paving section, curb, gutter and sidewalk placements are nearly complete.
- Remaining sections include the south side of Ustick and Black Cat.
- Asphalt paving along Ustick complete and nearly all lanes have been marked.
- Ustick and Black Cat signal swap to final configuration was completed this week.
- City of Meridian sewer and water line installation is complete.
- Water Control Vault commissioning work has started.
- Final remaining sections of concrete curb and gutter/sidewalk, along the eastern portion of Ustick, starting soon.