February 28, 2025
- Black Cat Road is closed south of Ustick Road.
- Ustick remains open: Traffic has been shifted onto the temporary asphalt on the south side of Ustick – one lane in each direction.
- Irrigation and seepage bed installation is ongoing.
- Roadway and sidewalk demo and prep are ongoing on the north side of Ustick.
- Eight mile irrigation: Excavation for the west side diversion structure complete.
- Utility relocations are nearly complete.
- Temporary precast sections have been set.
- Irrigation work on Nine mile and Rutledge continues.
- Headwall at Rutledge complete.
- Precast box fabrication complete for this season.
Share February 28, 2025 on Facebook
Share February 28, 2025 on X (formerly Twitter)
Share February 28, 2025 on Linkedin
Email February 28, 2025 link
This project is substantially complete.