January 10, 2024
- Black Cat Road is closed south of Ustick Road.
- Traffic has been shifted onto the temporary asphalt on the south side of Ustick.
- Irrigation and seepage bed installation is ongoing.
- Roadway and sidewalk demo and prep is ongoing.
- Eight Mile irrigation box on Black Cat has been demolished.
- Excavation for the west side headwall to start this week.
- Precast box fabrication started this week.
Share January 10, 2024 on Facebook
Share January 10, 2024 on X (formerly Twitter)
Share January 10, 2024 on Linkedin
Email January 10, 2024 link
This project is substantially complete.