January 31, 2025
- Black Cat Road is closed south of Ustick Road.
- Traffic has been shifted onto the temporary asphalt on the south side of Ustick.
- Irrigation and seepage bed installation is ongoing.
- Roadway and sidewalk demo and prep is ongoing.
- Eight mile irrigation box on Black Cat has been demolished.
- Excavation for the west side headwall to start this week.
- Precast box fabrication ongoing.