January 31, 2025

31 Jan 2025
  • Black Cat Road is closed south of Ustick Road.
  • Traffic has been shifted onto the temporary asphalt on the south side of Ustick.
  • Irrigation and seepage bed installation is ongoing.
  • Roadway and sidewalk demo and prep is ongoing.
  • Eight mile irrigation box on Black Cat has been demolished.
  • Excavation for the west side headwall to start this week.
  • Precast box fabrication ongoing.