March 6, 2025
- Black Cat Road is closed south of Ustick Road.
- Ustick remains open: Traffic has been shifted onto the temporary asphalt on the south side of Ustick – one lane in each direction.
- Irrigation and seepage bed installation is ongoing.
- Roadway and sidewalk demo and prep are ongoing on the north side of Ustick.
- Eightmile irrigation: Excavation for the west side diversion structure complete. Utility relocations are nearly complete. Temporary precast sections have been set.
- Irrigation work on Ninemile and Rutledge continues.
- Headwall at Rutledge complete.
- Precast box fabrication complete for this season.
Share March 6, 2025 on Facebook
Share March 6, 2025 on Twitter
Share March 6, 2025 on Linkedin
Email March 6, 2025 link

Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends