- Black Cat Road is closed south of Ustick Road.
- Ustick remains open: Traffic has been shifted onto the temporary asphalt on the south side of Ustick – one lane in each direction.
- Irrigation and seepage bed installation is ongoing.
- Roadway and sidewalk demo and prep are ongoing on the north side of Ustick.
- Eightmile irrigation: Excavation for the west side diversion structure complete. Utility relocations are nearly complete. Temporary precast sections have been set.
- Irrigation work on Ninemile and Rutledge continues.
- Headwall at Rutledge complete.
- Precast box fabrication complete for this season.
Share March 6, 2025 on Facebook
Share March 6, 2025 on X (formerly Twitter)
Share March 6, 2025 on Linkedin
Email March 6, 2025 link
This project is substantially complete.