Collister Drive Maintenance and Pedestrian Project, Quail Ridge Dr. to the cul-de-sac to the north
Share Collister Drive Maintenance and Pedestrian Project, Quail Ridge Dr. to the cul-de-sac to the north on Facebook
Share Collister Drive Maintenance and Pedestrian Project, Quail Ridge Dr. to the cul-de-sac to the north on Twitter
Share Collister Drive Maintenance and Pedestrian Project, Quail Ridge Dr. to the cul-de-sac to the north on Linkedin
Email Collister Drive Maintenance and Pedestrian Project, Quail Ridge Dr. to the cul-de-sac to the north link
Project Description
- Remove existing, deteriorating concrete roadway and replace with asphalt.
- Add speed humps.
- Replace the existing curb, gutter and four-foot sidewalk on the east side of the street with rolled curb and a five-foot sidewalk, matching the existing back of sidewalk.
- The intent is to have minimal impacts to private property; therefore, the new sidewalk will match the back of the existing sidewalk. However, temporary easements will still be needed during construction to facilitate sod repairs and sprinkler work.
- Temporary easements will allow for a working area and access as required for any driveway repairs, sprinkler/sod repairs, or other minor repair work that may be required on private properties for the installation of the new sidewalk.
Project Purpose
- Improve roadway surface
- Update pedestrian facilities to modern standards
Project Considerations
- Safety for pedestrians, bicyclists and motorists
- Property impacts
- Pavement condition
- Accessible sidewalks and pedestrian ramps