Locust Grove Road, Victory Road to Overland Road

Share Locust Grove Road, Victory Road to Overland Road on Facebook Share Locust Grove Road, Victory Road to Overland Road on Twitter Share Locust Grove Road, Victory Road to Overland Road on Linkedin Email Locust Grove Road, Victory Road to Overland Road link

Project is substantially complete

Locust Grove, Victory to Overland Project Description

  • Widen Locust Grove Rd. to two lanes in each direction, with a center turn lane
  • Add a 10-foot wide, buffered multi-use pathway for pedestrians and bicyclists to share.
  • Install a signalized pedestrian crossing at Time Zone Dr. and relocate the existing crossing at Mastiff St. slightly to the north.
  • Add center island medians at two locations between Sagemoor Drive and Fireside Drive, as well as between Puffin Street and Peacock Street.

Locust Grove and Victory Roundabout Project Description

  • Construct a dual-lane roundabout at the Locust Grove Rd. and Victory Rd. intersection. Two lanes will approach the roundabout and two lanes will go thru the roundabout.
  • Add a 10-foot wide, buffered multi-use pathway for pedestrians and bicyclists to share.
  • Include bike ramps at entrance to roundabout.
  • Add crosswalks at each leg of intersection with two-stage pedestrian crossings.
  • Include a truck apron for larger vehicles to use if necessary.
  • Intersection will be closed for gas, water, power/utility work.

Commuters are reminded to obey all road closure signs and follow the signs along the detour route. Commuters should never attempt to drive, bike, or walk on closed portions of the road, regardless of whether there appears to be active construction. It is unlawful to move or manipulate construction signs and doing so can put commuters and construction workers at great risk.

Locust Grove, Victory to Overland Project Description

  • Widen Locust Grove Rd. to two lanes in each direction, with a center turn lane
  • Add a 10-foot wide, buffered multi-use pathway for pedestrians and bicyclists to share.
  • Install a signalized pedestrian crossing at Time Zone Dr. and relocate the existing crossing at Mastiff St. slightly to the north.
  • Add center island medians at two locations between Sagemoor Drive and Fireside Drive, as well as between Puffin Street and Peacock Street.

Locust Grove and Victory Roundabout Project Description

  • Construct a dual-lane roundabout at the Locust Grove Rd. and Victory Rd. intersection. Two lanes will approach the roundabout and two lanes will go thru the roundabout.
  • Add a 10-foot wide, buffered multi-use pathway for pedestrians and bicyclists to share.
  • Include bike ramps at entrance to roundabout.
  • Add crosswalks at each leg of intersection with two-stage pedestrian crossings.
  • Include a truck apron for larger vehicles to use if necessary.
  • Intersection will be closed for gas, water, power/utility work.

Commuters are reminded to obey all road closure signs and follow the signs along the detour route. Commuters should never attempt to drive, bike, or walk on closed portions of the road, regardless of whether there appears to be active construction. It is unlawful to move or manipulate construction signs and doing so can put commuters and construction workers at great risk.

Project is substantially complete

  • September 29, 2023

    Share September 29, 2023 on Facebook Share September 29, 2023 on Twitter Share September 29, 2023 on Linkedin Email September 29, 2023 link

    This project is substantially complete.

    Interested in reviewing the final drone footage of the project? View here.

  • September 22, 2023

    Share September 22, 2023 on Facebook Share September 22, 2023 on Twitter Share September 22, 2023 on Linkedin Email September 22, 2023 link
    • Locust Grove and the roundabout are now open. Please use caution as minor work still remains.
    • Landscaping and fencing ongoing.
    • Minor punch list items remaining.
  • September 8, 2023

    Share September 8, 2023 on Facebook Share September 8, 2023 on Twitter Share September 8, 2023 on Linkedin Email September 8, 2023 link
    • Locust Grove and Victory Intersection o East, West, and South lanes open.
    • Locust Grove o Mainline Paving complete.
    • Approaches anticipated paving Sept 7th.
    • Placing concrete buffer.
  • August 31, 2023

    Share August 31, 2023 on Facebook Share August 31, 2023 on Twitter Share August 31, 2023 on Linkedin Email August 31, 2023 link
    • Locust Grove and Victory Intersection - East, West and South lanes open
    • Locust Grove - Main line paving complete. Approaches anticipated paving September 9th. Pacing concrete buffer. 1st coat of pavement markings complete.

    Locust Grove is closed. Thank you for your patience during construction.

  • August 25, 2023

    Share August 25, 2023 on Facebook Share August 25, 2023 on Twitter Share August 25, 2023 on Linkedin Email August 25, 2023 link
    • Locust Grove and Victory intersection - East, West, and South lanes open. Placing pedestrian rail at roundabout.
    • Locust Grove - Paving complete between Charolais and Victory. Excavating East side of Peacock and Charolais Drive. Placing curb and sidewalk.
    • School flasher installation ongoing.
  • August 18, 2023

    Share August 18, 2023 on Facebook Share August 18, 2023 on Twitter Share August 18, 2023 on Linkedin Email August 18, 2023 link
    • Locust Grove and Victory intersection - East, West and South lanes open. Placing pedestrian rail at roundabout.
    • Locust Grove - Paving complete between Charolais and Victory. Excavating East side of Peacock and Charolais Dr. Placing curb and sidewalk. School flasher ongoing.
  • August 11, 2023

    Share August 11, 2023 on Facebook Share August 11, 2023 on Twitter Share August 11, 2023 on Linkedin Email August 11, 2023 link
    • Locust Grove and Victory intersection - East, West, and South lanes open.
    • Placing pedestrian rail at roundabout.
    • Locust Grove - Paving complete between Charolais and Victory. Excavating East side of Peacock and Charolais Dr. Placing curb and sidewalk. Installation of school flashing beacon ongoing.
  • August 4, 2023

    Share August 4, 2023 on Facebook Share August 4, 2023 on Twitter Share August 4, 2023 on Linkedin Email August 4, 2023 link
    • Locust Grove and Victory intersection - Pavement marking being placed. Roundabout anticipated to be opened August 4th.
    • Locust Grove - Gravel being placed. Sidewalk and curbing ongoing. Paved west side between Peacock and Charolais Dr. Excavating east side of Peacock and Charolais Dr. Paving anticipated week of the 14th on Locust Grove.
  • July 28, 2023

    Share July 28, 2023 on Facebook Share July 28, 2023 on Twitter Share July 28, 2023 on Linkedin Email July 28, 2023 link
    • Locust Grove and Victory intersection - roundabout concrete ongoing. Splinter island infill ongoing. Round about infill after ongoing.
    • Locust Grove - Gravel being placed. Sidewalk and curb ongoing.
  • July 14, 2023

    Share July 14, 2023 on Facebook Share July 14, 2023 on Twitter Share July 14, 2023 on Linkedin Email July 14, 2023 link
    • Locust Grove and Victory Intersection - Roundabout concrete ongoing
    • Splinter island infill ongoing. Roundabout infill after - ongoing
    • Locust Grove - gravel being placed. Sidewalk and curb ongoing.