Locust Grove Road, Victory Road to Overland Road

Share Locust Grove Road, Victory Road to Overland Road on Facebook Share Locust Grove Road, Victory Road to Overland Road on Twitter Share Locust Grove Road, Victory Road to Overland Road on Linkedin Email Locust Grove Road, Victory Road to Overland Road link

Project is substantially complete

Locust Grove, Victory to Overland Project Description

  • Widen Locust Grove Rd. to two lanes in each direction, with a center turn lane
  • Add a 10-foot wide, buffered multi-use pathway for pedestrians and bicyclists to share.
  • Install a signalized pedestrian crossing at Time Zone Dr. and relocate the existing crossing at Mastiff St. slightly to the north.
  • Add center island medians at two locations between Sagemoor Drive and Fireside Drive, as well as between Puffin Street and Peacock Street.

Locust Grove and Victory Roundabout Project Description

  • Construct a dual-lane roundabout at the Locust Grove Rd. and Victory Rd. intersection. Two lanes will approach the roundabout and two lanes will go thru the roundabout.
  • Add a 10-foot wide, buffered multi-use pathway for pedestrians and bicyclists to share.
  • Include bike ramps at entrance to roundabout.
  • Add crosswalks at each leg of intersection with two-stage pedestrian crossings.
  • Include a truck apron for larger vehicles to use if necessary.
  • Intersection will be closed for gas, water, power/utility work.

Commuters are reminded to obey all road closure signs and follow the signs along the detour route. Commuters should never attempt to drive, bike, or walk on closed portions of the road, regardless of whether there appears to be active construction. It is unlawful to move or manipulate construction signs and doing so can put commuters and construction workers at great risk.

Locust Grove, Victory to Overland Project Description

  • Widen Locust Grove Rd. to two lanes in each direction, with a center turn lane
  • Add a 10-foot wide, buffered multi-use pathway for pedestrians and bicyclists to share.
  • Install a signalized pedestrian crossing at Time Zone Dr. and relocate the existing crossing at Mastiff St. slightly to the north.
  • Add center island medians at two locations between Sagemoor Drive and Fireside Drive, as well as between Puffin Street and Peacock Street.

Locust Grove and Victory Roundabout Project Description

  • Construct a dual-lane roundabout at the Locust Grove Rd. and Victory Rd. intersection. Two lanes will approach the roundabout and two lanes will go thru the roundabout.
  • Add a 10-foot wide, buffered multi-use pathway for pedestrians and bicyclists to share.
  • Include bike ramps at entrance to roundabout.
  • Add crosswalks at each leg of intersection with two-stage pedestrian crossings.
  • Include a truck apron for larger vehicles to use if necessary.
  • Intersection will be closed for gas, water, power/utility work.

Commuters are reminded to obey all road closure signs and follow the signs along the detour route. Commuters should never attempt to drive, bike, or walk on closed portions of the road, regardless of whether there appears to be active construction. It is unlawful to move or manipulate construction signs and doing so can put commuters and construction workers at great risk.

Project is substantially complete

  • July 7, 2023

    Share July 7, 2023 on Facebook Share July 7, 2023 on Twitter Share July 7, 2023 on Linkedin Email July 7, 2023 link
    • Locust Grove and Victory intersection - Paving ongoing. Roundabout concrete on-going. Splinter island curb anticipated June 30th. Roundabout in-fill after paving.
    • Locust Grove - Gravel being placed. Sidewalk will be placed starting July 5th. Curb placement will begin after sidewalk.

    Interested in reviewing the progress of the project? Review the latest drone footage.

  • June 30, 2023

    Share June 30, 2023 on Facebook Share June 30, 2023 on Twitter Share June 30, 2023 on Linkedin Email June 30, 2023 link
    • Locust Grove and Victory intersection - paving ongoing. Roundabout concrete ongoing. Splinter island curb anticipated June 30th. Roundabout in-fill after paving.
    • Locust Grove - gravel being placed. Sidewalk will be placed starting July 5th. Curb placement will begin after sidewalk.
  • June 23, 2023

    Share June 23, 2023 on Facebook Share June 23, 2023 on Twitter Share June 23, 2023 on Linkedin Email June 23, 2023 link
    • Locust Grove and Victory intersection - curb, gutter complete. Roundabout concrete ongoing. Paving anticipated the week of June 26th. Island curb will be installed after paving. Round about curb being placed.
    • Locust Grove - Gravel being placed. Sidewalk will be placed starting June 26th. Curb placement will begin after sidewalk.
  • June 9, 2023

    Share June 9, 2023 on Facebook Share June 9, 2023 on Twitter Share June 9, 2023 on Linkedin Email June 9, 2023 link
    • Locust Grove and Victory Intersection - Placing sidewalk, curb and gutter and 3/4 base. Paving anticipated the week of June 26th. Island curb after paving.
    • Locust Grove - Underground facilities complete. Establishing subgrade. Placing base gravel.

    Interested in reviewing the progress of the project? Review the latest drone footage.

  • June 2, 2023

    Share June 2, 2023 on Facebook Share June 2, 2023 on Twitter Share June 2, 2023 on Linkedin Email June 2, 2023 link
    • Locust Grove and Victory intersection - placing sidewalk, curb and gutter - 3/4 base.
    • Paving anticipated the week of the 26th.
    • Island curb after paving.
    • Locust Grove - underground facilities complete. Establishing subgrade and placing base gravel.
  • May 26, 2023

    Share May 26, 2023 on Facebook Share May 26, 2023 on Twitter Share May 26, 2023 on Linkedin Email May 26, 2023 link
    • Locust Grove and Victory Intersection - Underground facilities complete. Placing sidewalk curb and gutter. Final grading anticipated after gutter is placed.
    • Locust Grove - Seepage beds installed. Underground facilities ongoing. Placing base on the east side of Locust Grove.
  • May 19, 2023

    Share May 19, 2023 on Facebook Share May 19, 2023 on Twitter Share May 19, 2023 on Linkedin Email May 19, 2023 link
    • Locust Grove and Victory Intersection - water line ongoing. Placing subgrade down Victory. Sidewalk being placed.
    • Locust Grove - Nine Mile Creek - Complete.
    • Installing water line on Coastline, working north.
    • Sub-grading and placing base behind water installation.

    Interested in reviewing the progress of the project? Review the latest drone footage.

  • May 12, 2023

    Share May 12, 2023 on Facebook Share May 12, 2023 on Twitter Share May 12, 2023 on Linkedin Email May 12, 2023 link
    • Locust Grove and Victory intersection - Water line ongoing. Placing subgrade down Victory. Sidewalk being placed.
    • Locust Grove - Nine Mile Creek - complete. Installing waterline on Coastline working north. Sub grading and placing base behind water installation.
  • May 5, 2023

    Share May 5, 2023 on Facebook Share May 5, 2023 on Twitter Share May 5, 2023 on Linkedin Email May 5, 2023 link
    • Locust Grove and Victory Intersection - Water line ongoing. Placing subgrade down Victory.
    • Locust Grove - Nine Mile Creek - Complete. Installing waterline on Coastline, will work North. Subgrading and placing base behind water installation.
  • April 21, 2023

    Share April 21, 2023 on Facebook Share April 21, 2023 on Twitter Share April 21, 2023 on Linkedin Email April 21, 2023 link
    • Locust Grove and Victory Intersection - water line ongoing. Placing subgrade down Victory.
    • Locust Grove - Nine Mile Creek - complete. Installing waterline on Coastline - will work North. Sub grading and placing base behind water installation.

    Interested in reviewing the progress of the project? View the latest drone footage.