Project is substantially complete

Locust Grove, Victory to Overland Project Description

  • Widen Locust Grove Rd. to two lanes in each direction, with a center turn lane
  • Add a 10-foot wide, buffered multi-use pathway for pedestrians and bicyclists to share.
  • Install a signalized pedestrian crossing at Time Zone Dr. and relocate the existing crossing at Mastiff St. slightly to the north.
  • Add center island medians at two locations between Sagemoor Drive and Fireside Drive, as well as between Puffin Street and Peacock Street.

Locust Grove and Victory Roundabout Project Description

  • Construct a dual-lane roundabout at the Locust Grove Rd. and Victory Rd. intersection. Two lanes will approach the roundabout and two lanes will go thru the roundabout.
  • Add a 10-foot wide, buffered multi-use pathway for pedestrians and bicyclists to share.
  • Include bike ramps at entrance to roundabout.
  • Add crosswalks at each leg of intersection with two-stage pedestrian crossings.
  • Include a truck apron for larger vehicles to use if necessary.
  • Intersection will be closed for gas, water, power/utility work.

Commuters are reminded to obey all road closure signs and follow the signs along the detour route. Commuters should never attempt to drive, bike, or walk on closed portions of the road, regardless of whether there appears to be active construction. It is unlawful to move or manipulate construction signs and doing so can put commuters and construction workers at great risk.

Locust Grove, Victory to Overland Project Description

  • Widen Locust Grove Rd. to two lanes in each direction, with a center turn lane
  • Add a 10-foot wide, buffered multi-use pathway for pedestrians and bicyclists to share.
  • Install a signalized pedestrian crossing at Time Zone Dr. and relocate the existing crossing at Mastiff St. slightly to the north.
  • Add center island medians at two locations between Sagemoor Drive and Fireside Drive, as well as between Puffin Street and Peacock Street.

Locust Grove and Victory Roundabout Project Description

  • Construct a dual-lane roundabout at the Locust Grove Rd. and Victory Rd. intersection. Two lanes will approach the roundabout and two lanes will go thru the roundabout.
  • Add a 10-foot wide, buffered multi-use pathway for pedestrians and bicyclists to share.
  • Include bike ramps at entrance to roundabout.
  • Add crosswalks at each leg of intersection with two-stage pedestrian crossings.
  • Include a truck apron for larger vehicles to use if necessary.
  • Intersection will be closed for gas, water, power/utility work.

Commuters are reminded to obey all road closure signs and follow the signs along the detour route. Commuters should never attempt to drive, bike, or walk on closed portions of the road, regardless of whether there appears to be active construction. It is unlawful to move or manipulate construction signs and doing so can put commuters and construction workers at great risk.

Project is substantially complete

  • February 3, 2023

    Share February 3, 2023 on Facebook Share February 3, 2023 on Twitter Share February 3, 2023 on Linkedin Email February 3, 2023 link
    • Locust Grove and Victory - utility companies relocating their lines.
    • Culvert on Victory removed.
    • Water line ongoing.
    • Intermountain gas relocating their facilities.
    • Locust Grove to Charolais closed.
    • Local traffic only through to Locust Grove.
    • Nine Mile Creek headwalls excavated.
    • Forming footings for headwalls.
    • Excavation heading north from Lake Creek.

    Interested in reviewing the latest aerial footage of the project? Click here.

  • January 27, 2023

    Share January 27, 2023 on Facebook Share January 27, 2023 on Twitter Share January 27, 2023 on Linkedin Email January 27, 2023 link
    • Locust Grove and Victory intersection
    • Utility companies are relocating their lines.
    • Culvert on Victory being removed.
    • Water installation ongoing.
    • Locust Grove - closure from Charolais Drive to Victory started January 16th.
    • Local traffic only Locust Grove.
    • Asphalt removal ongoing.
    • Culvert replacement starting the 26th.
  • January 20, 2023

    Share January 20, 2023 on Facebook Share January 20, 2023 on Twitter Share January 20, 2023 on Linkedin Email January 20, 2023 link
    • Utility company relocating their lines.
    • Culvert on Victory being removed.
    • Water installation ongoing.
    • Closure from Charolais to Victory started January 16th.
    • Asphalt removal ongoing.
    • Culvert replacement starting January 26th.
  • January 13, 2023

    Share January 13, 2023 on Facebook Share January 13, 2023 on Twitter Share January 13, 2023 on Linkedin Email January 13, 2023 link
    • Locust Grove and Victory intersection - utility companies relocating their lines.
    • Culvert on Victory being removed.
    • Water installation ongoing.
    • Locust Grove - Closure from Charloais Drive to Victory starting January 16th.
    • Asphalt removal starting on the 18th.
    • Culvert replacement starting the 26th.
  • January 12, 2023

    Share January 12, 2023 on Facebook Share January 12, 2023 on Twitter Share January 12, 2023 on Linkedin Email January 12, 2023 link

    Please see the updated closure on Locust Grove from Charolais to Victory. ACHD appreciates your continued patience with the roundabout project.

  • January 6, 2023

    Share January 6, 2023 on Facebook Share January 6, 2023 on Twitter Share January 6, 2023 on Linkedin Email January 6, 2023 link
    • Starting the excavation at roundabout.
    • Continuing to remove trees on project.
  • January 6, 2023

    Share January 6, 2023 on Facebook Share January 6, 2023 on Twitter Share January 6, 2023 on Linkedin Email January 6, 2023 link
    supporting image

    Please see the updated detour map for the Locust Grove Construction project.

  • December 22, 2022

    Share December 22, 2022 on Facebook Share December 22, 2022 on Twitter Share December 22, 2022 on Linkedin Email December 22, 2022 link
    • Excavation is starting at roundabout.
    • Continuing to remove trees on project.
  • December 16, 2022

    Share December 16, 2022 on Facebook Share December 16, 2022 on Twitter Share December 16, 2022 on Linkedin Email December 16, 2022 link
    • Contractor milling road and started clearing and grubbing.
  • December 9, 2022

    Share December 9, 2022 on Facebook Share December 9, 2022 on Twitter Share December 9, 2022 on Linkedin Email December 9, 2022 link
    • Locust Grove and Victory will be closed for roundabout construction beginning December 8th. Please see the detour map for additional information.