Coston Street Sidewalk Project

Share Coston Street Sidewalk Project on Facebook Share Coston Street Sidewalk Project on Twitter Share Coston Street Sidewalk Project on Linkedin Email Coston Street Sidewalk Project link

The Ada County Highway District (ACHD) is designing sidewalks for Coston Street between Warm Springs Avenue and Franklin Street. The purpose of this project is to improve safety and increase connectivity for pedestrians.

Project Description

  • Construct curb, gutter, and a 5-foot sidewalk on both sides of Coston Street from Warm Springs Avenue to Franklin Street.
  • Rebuild Coston Street from Warm Springs Avenue to Franklin Street.
  • Add and/or improve pedestrian ramps.
  • Construct bulb-outs at all major intersections along Coston Street (Bannock Street, Jefferson Street, State Street, Washington Street, Franklin Street, Mobley Drive, and Hillview Drive).
  • Most existing sidewalk will be retained.

The Ada County Highway District (ACHD) is designing sidewalks for Coston Street between Warm Springs Avenue and Franklin Street. The purpose of this project is to improve safety and increase connectivity for pedestrians.

Project Description

  • Construct curb, gutter, and a 5-foot sidewalk on both sides of Coston Street from Warm Springs Avenue to Franklin Street.
  • Rebuild Coston Street from Warm Springs Avenue to Franklin Street.
  • Add and/or improve pedestrian ramps.
  • Construct bulb-outs at all major intersections along Coston Street (Bannock Street, Jefferson Street, State Street, Washington Street, Franklin Street, Mobley Drive, and Hillview Drive).
  • Most existing sidewalk will be retained.
  • April 9, 2024

    Share April 9, 2024 on Facebook Share April 9, 2024 on Twitter Share April 9, 2024 on Linkedin Email April 9, 2024 link

    On March 27, 2024, the Commission adopted Concept #2 - Attached Sidewalk, which replaces on-street parking with extended bulb-outs at select properties.

    • Redesign will be completed in FY24.
    • Property purchases, as needed, to occur in FY25.
    • Construction year is not yet programmed.
  • Join us for the Coston Street adoption hearing!

    Share Join us for the Coston Street adoption hearing! on Facebook Share Join us for the Coston Street adoption hearing! on Twitter Share Join us for the Coston Street adoption hearing! on Linkedin Email Join us for the Coston Street adoption hearing! link

    The Ada County Highway District (ACHD) will consider the adoption of a concept alternative for the Coston Street Sidewalk Project during the March 27, 2024 hearing. The meeting will begin at 6 p.m.; however, this project is one of several agenda items and may not be the first item discussed. ACHD staff will make a brief presentation followed by an opportunity for public comment before the Commission acts.

    Alternatives under consideration:

    Both concepts include:

    • Curb, gutter, and a 5-foot sidewalk on both sides of Coston Street from Warm Springs Avenue to Franklin Street.
    • Rebuilding Coston Street from Warm Springs Avenue to Franklin Street.
    • Adding and/or improving pedestrian ramps.
    • Constructing bulb-outs at all major intersections along Coston Street (Bannock Street, Jefferson Street, State Street, Washington Street, Franklin Street, Mobley Drive, and Hillview Drive).
    • Retaining most existing sidewalk.

    Commission Meeting

    MARCH 27, 2024 | 6:00 P.M.

    There are several ways to participate in the Commission Meeting:

    In-Person

    • Join us at 3775 Adams Street in Garden City in the Auditorium.

    Virtually

    • Participate online. The Meeting will be live-streamed and members of the public who wish to watch and ask questions can do so using Zoom.
  • What We Heard

    Share What We Heard on Facebook Share What We Heard on Twitter Share What We Heard on Linkedin Email What We Heard link

    View the fall 2023 public comment summary and infographic below!

  • Commission Meeting

    Share Commission Meeting on Facebook Share Commission Meeting on Twitter Share Commission Meeting on Linkedin Email Commission Meeting link

    The fall 2023 public outreach results will be presented to the ACHD Commission on February 21, 2024.

    The meeting will begin at 12 p.m.; however, this project is one of several agenda items and may not be the first item discussed.

    Commission Meeting

    February 21, 2024 | 12:00 P.M.

    There are several ways to participate in the Commission Meeting:

    In-Person

    • Join us at 3775 Adams Street in Garden City in the Auditorium.

    Virtually

    • Participate online. The Meeting will be live-streamed and members of the public who wish to watch and ask questions can do so using Zoom.
  • Learn more and view the concepts!

    Share Learn more and view the concepts! on Facebook Share Learn more and view the concepts! on Twitter Share Learn more and view the concepts! on Linkedin Email Learn more and view the concepts! link

    Please review the information below to learn more about the project. While your comments are always welcome, your comments can be best used if received before November 8, 2023.


    Residents along Coston Street were asked via a petition (administered and circulated by the East End Neighborhood Association) if they supported bulb-outs and sidewalks in place of on-street parking at some locations. Enough residents signed the petition prompting ACHD to design the two alternatives shown.


    Questions?

    Join us for a public open house.

    November 1, 2023

    • 5:30 - 6:30 p.m.
    • Roosevelt Elementary (908 E Jefferson St)

    Walking, biking & carpooling encouraged due to limited parking.

  • July 2022 Public Outreach Summary

    Share July 2022 Public Outreach Summary on Facebook Share July 2022 Public Outreach Summary on Twitter Share July 2022 Public Outreach Summary on Linkedin Email July 2022 Public Outreach Summary link

    In July 2022, ACHD asked the public for feedback on the Coston Street Sidewalk Project.

    There were 117 total respondents to the survey, with most in favor of the proposed design.

    • 82% (96 respondents) were supportive of the project.
    • 12% (14 respondents) were unsupportive of the project.
    • 6% (7 respondents) were unsure of the project design.

    Frequently Asked Questions

    • Why were bulbouts on Coston Street at Hillview Drive included in the project design?

    There are significant utilities at the Coston and Hillview intersection. The bulbout placement here allows the pedestrian ramps to be compliant with modern standards.

    • Will ACHD need to purchase my property for the project?

    Most of the improvements fit in the public right-of-way and ACHD will not need to purchase much property.

    However, Temporary Construction Easements (TCE) will be needed along some properties. This is so we can repair and clean any driveways impacted by construction.

    • Why aren’t there more traffic calming methods in place?

    Due to the current 20 mph speed limit and traffic volumes, additional traffic calming is not currently necessary for this corridor.

    • How does ACHD decide what trees are removed and which ones are not?

    ACHD works hard to impact trees as little as possible when designing improvements. Unfortunately, sometimes trees must be removed due to sidewalk impacts, utilities, and updated pedestrian ramps.

    The trees slated for removal are identified and reviewed by a City of Boise Arborist, ACHD, and Boise Parks and Recreation. ACHD pays to have the trees removed as part of the construction cost.

Page last updated: 10 Apr 2024, 10:47 AM