Starting as early as November, the Ada County Highway District (ACHD) will reconstruct Hubbard Road from Ten Mile Road to Meridian Road as part of the 2025 Arterial & Collector Capital Maintenance Project. Construction is expected to be complete late summer of 2026.*

Project Highlights

  • Reconstructing the roadway pavement on Hubbard Road
  • Upgrading pedestrian ramps, sidewalks, and curb & gutter at key intersections
  • Adding 6-ft bike lanes on both sides of Hubbard Road, with multi-use or asphalt pathways at select locations
  • Replacing an irrigation culvert bridge and the existing pipe on the State Lateral canal
  • Installing railing on top of the Kuna Canal wingwalls
  • Upgrading the City of Kuna’s water and sewer

Construction Impacts

  • Temporary road closures
  • Pedestrian detours and sidewalk closures
  • Lane restrictions with flaggers
  • General construction noise, dust, equipment backup alarms and ground vibration
  • Crews will work from 7 a.m. to 7 p.m. unless otherwise approved
  • The contractor will work with property owners to minimize impacts

Starting as early as November, the Ada County Highway District (ACHD) will reconstruct Hubbard Road from Ten Mile Road to Meridian Road as part of the 2025 Arterial & Collector Capital Maintenance Project. Construction is expected to be complete late summer of 2026.*

Project Highlights

  • Reconstructing the roadway pavement on Hubbard Road
  • Upgrading pedestrian ramps, sidewalks, and curb & gutter at key intersections
  • Adding 6-ft bike lanes on both sides of Hubbard Road, with multi-use or asphalt pathways at select locations
  • Replacing an irrigation culvert bridge and the existing pipe on the State Lateral canal
  • Installing railing on top of the Kuna Canal wingwalls
  • Upgrading the City of Kuna’s water and sewer

Construction Impacts

  • Temporary road closures
  • Pedestrian detours and sidewalk closures
  • Lane restrictions with flaggers
  • General construction noise, dust, equipment backup alarms and ground vibration
  • Crews will work from 7 a.m. to 7 p.m. unless otherwise approved
  • The contractor will work with property owners to minimize impacts
  • February 19, 2025

    Share February 19, 2025 on Facebook Share February 19, 2025 on Twitter Share February 19, 2025 on Linkedin Email February 19, 2025 link
    • Hubbard Road remains closed between Ten Mile Road and Linder Road.
    • Roadway has been milled and demo of existing facilities is ongoing.
    • Contractor started roadway excavation and grade prep this week at Ten Mile headed east.
    • Utility conflict was identified, which may delay the excavation on the south side of Hubbard.
    • Contractor continuing the City of Kuna utility work.
    • Contactor continues setting the retaining wall on the northwest end of the project.
  • February 12, 2026

    Share February 12, 2026 on Facebook Share February 12, 2026 on Twitter Share February 12, 2026 on Linkedin Email February 12, 2026 link
    • Hubbard Road remains closed between Ten Mile Road and Linder Road.
    • Ten Mile Road and Linder Road will remain open during this phase of work.
    • Flagging and a partial daily closure (east of Linder, on Hubbard) will be complete this week for utility installation within the intersection.
    • Roadway has been milled and demo of existing facilities is ongoing.
    • Contractor to start roadway excavation and grade prep next week at Ten Mile headed east.
    • Contractor continuing the City of Kuna utility work.
    • Contactor has started setting the retaining wall on the northwest end of the project.
  • February 5, 2026

    Share February 5, 2026 on Facebook Share February 5, 2026 on Twitter Share February 5, 2026 on Linkedin Email February 5, 2026 link
    • Hubbard Road remains closed between Ten Mile Road and Linder Road.
    • Ten Mile Road and Linder Road will remain open during this phase of work.
    • Flagging and a partial daily closure (east of Linder, on Hubbard) will occur next week for utility installation within the intersection. Partial closure will be between the hours of 10AM and 3PM starting Monday, February 9 rd through Thursday, February 12th.
    • Roadway has been milled and demo of existing facilities is ongoing.
    • Contractor continuing the City of Kuna utility work.
    • Contactor has started setting the retaining wall on the northwest end of the project.
  • Updated Detour Map & Information - February 5, 2026

    Share Updated Detour Map & Information - February 5, 2026 on Facebook Share Updated Detour Map & Information - February 5, 2026 on Twitter Share Updated Detour Map & Information - February 5, 2026 on Linkedin Email Updated Detour Map & Information - February 5, 2026 link

    Due to a required utility locate process, the utility work on Hubbard Road was not completed on the original schedule. Hubbard Road east of Linder Road will reopen over the weekend, but additional work will be needed next week to complete the installation.

    Beginning Monday, daytime traffic restrictions will resume at the intersection of Linder Road and Hubbard Road. From 10 a.m. to 3 p.m., east–west traffic on Hubbard Road will be closed, while north–south traffic on Linder Road will remain open with flagging operations in place. Outside of these hours, the intersection will be fully open to accommodate school and commuter traffic.

    These daytime restrictions will be in place Monday through Thursday.

    This utility work is being completed in coordination with ACHD’s 2025 Arterial and Collector Capital Maintenance project, which includes improvements on Hubbard Road between Ten Mile Road and Meridian Road. Construction on the larger project is expected to continue through late summer 2026.



  • Detour Map Information - January 30, 2026

    Share Detour Map Information - January 30, 2026 on Facebook Share Detour Map Information - January 30, 2026 on Twitter Share Detour Map Information - January 30, 2026 on Linkedin Email Detour Map Information - January 30, 2026 link

  • January 30, 2026

    Share January 30, 2026 on Facebook Share January 30, 2026 on Twitter Share January 30, 2026 on Linkedin Email January 30, 2026 link
    • Hubbard Road remains closed between Ten Mile Road and Linder Road.
    • Ten Mile Road and Linder Road will remain open during this phase of work.
    • Flagging and a partial daily closure (east of Linder, on Hubbard) will occur next week for utility installation within the intersection.
    • Partial closure will be between the hours of 9AM and 4PM starting Tuesday, February 3rd through Friday, February 6th.
    • Roadway has been milled and demo of existing facilities is ongoing.
    • Contractor continuing the City of Kuna utility work.
    • Daytime closures of the Hubbard Road and Linder Road intersection are anticipated for early February for City of Kuna utility work.
  • January 23, 2026

    Share January 23, 2026 on Facebook Share January 23, 2026 on Twitter Share January 23, 2026 on Linkedin Email January 23, 2026 link
    • Hubbard Road remains closed between Ten Mile Road and Linder Road.
    • Ten Mile Road and Linder Road will remain open during this phase of work.
    • Flagging may occur for utility installation within the intersections.
    • Roadway has been milled and demo of existing facilities is ongoing.
    • Contractor continuing the City of Kuna utility work.
    • Daytime closures of the Hubbard Road and Linder Road intersection are anticipated for early February for City of Kuna utility work
  • January 16, 2026

    Share January 16, 2026 on Facebook Share January 16, 2026 on Twitter Share January 16, 2026 on Linkedin Email January 16, 2026 link
    • Hubbard Road remains closed between Ten Mile Road and Linder Road.
    • Ten Mile Road and Linder Road will remain open during this phase of work.
    • Flagging may occur for utility installation within the intersections.
    • Roadway has been milled and demo of existing facilities is ongoing.
    • Contractor continuing the City of Kuna utility work.
    • Daytime closures of the Hubbard Road and Linder Road intersection are anticipated for early.
    • February for City of Kuna utility work.
  • January 9, 2026

    Share January 9, 2026 on Facebook Share January 9, 2026 on Twitter Share January 9, 2026 on Linkedin Email January 9, 2026 link
    • Project includes work on Hubbard Road between Ten Mile Road and Meridian Road.
    • Hubbard Road remains closed between Ten Mile Road and Linder Road.
    • Ten Mile Road and Linder Road will remain open during this phase of work.
    • Flagging may occur for utility installation within the intersections.
    • Roadway has been milled and demo of existing facilities is ongoing.
    • Contractor continuing the City of Kuna utility work.
  • December 18, 2025

    Share December 18, 2025 on Facebook Share December 18, 2025 on Twitter Share December 18, 2025 on Linkedin Email December 18, 2025 link
    • Hubbard Road remains closed between Ten Mile Road and Linder Road.
    • Ten Mile Road and Linder Road will remain open during this phase of work.
    • Flagging may occur for utility installation within the intersections.
    • Roadway has been milled and demo of existing facilities is ongoing.
    • Contractor started the City of Kuna utility work.
    • Work will resume after the holidays.
Page last updated: 19 Feb 2026, 01:01 PM