Rose Hill St. Temporary Traffic Calming, Roosevelt St. to Vista Ave.

Share Rose Hill St. Temporary Traffic Calming, Roosevelt St. to Vista Ave. on Facebook Share Rose Hill St. Temporary Traffic Calming, Roosevelt St. to Vista Ave. on Twitter Share Rose Hill St. Temporary Traffic Calming, Roosevelt St. to Vista Ave. on Linkedin Email Rose Hill St. Temporary Traffic Calming, Roosevelt St. to Vista Ave. link


ACHD is designing temporary traffic calming features for Rose Hill Street from Roosevelt Street to Vista Avenue to enhance the safety for all users.

The concept design was created through a community outreach process and parking analysis and was adopted by the ACHD Commission in Fall 2022.

The project will provide a variety of traffic calming measures and enhanced bicycle infrastructure along Rose Hill Street.

Project Description

  • Add on-street bike lanes, separated by a painted buffer with a vertical element.
  • Remove the continuous center left-turn lane in most areas.
  • Retain parking on one side of the street, except between Latah and Owyhee streets, alternating sides of the street to provide shifts in the travel lanes.

* Design of the Rose Hill and Owyhee mini-roundabout was completed as a separate project.


ACHD is designing temporary traffic calming features for Rose Hill Street from Roosevelt Street to Vista Avenue to enhance the safety for all users.

The concept design was created through a community outreach process and parking analysis and was adopted by the ACHD Commission in Fall 2022.

The project will provide a variety of traffic calming measures and enhanced bicycle infrastructure along Rose Hill Street.

Project Description

  • Add on-street bike lanes, separated by a painted buffer with a vertical element.
  • Remove the continuous center left-turn lane in most areas.
  • Retain parking on one side of the street, except between Latah and Owyhee streets, alternating sides of the street to provide shifts in the travel lanes.

* Design of the Rose Hill and Owyhee mini-roundabout was completed as a separate project.

  • May 31, 2024

    Share May 31, 2024 on Facebook Share May 31, 2024 on Twitter Share May 31, 2024 on Linkedin Email May 31, 2024 link
    • Notice to proceed is anticipated for June.
  • Construction to start as early as the end of May

    Share Construction to start as early as the end of May on Facebook Share Construction to start as early as the end of May on Twitter Share Construction to start as early as the end of May on Linkedin Email Construction to start as early as the end of May link

    The Ada County Highway District (ACHD) will be building a mini-roundabout at the Rose Hill and Owyhee intersection, as well as updating Rose Hill between Roosevelt and Vista with temporary traffic calming features. The goal of both projects is to slow down traffic and improve the street for all users. Construction will start as early as late May 2024* and completion is expected Fall 2024.


    Project Description

    • Construct a mini-roundabout at the Rose Hill and Owyhee intersection with Rectangular Rapid Flashing Beacons (RRFB) at each pedestrian crossing.
    • After chip sealing Rose Hill Street, temporarily reallocate street space and remove center turn lane (in most areas) to provide:
      • Bike lanes on both sides of the street, with vertical elements and painted buffers.
      • On-street parking on one side of the street, except between Latah Street and Owyhee Street, alternating sides of the street to help slow traffic.


    Traffic and Construction Impacts

    • Temporary pedestrian detours.
    • On-street parking impacts.
    • Lane restrictions with flaggers.
    • General construction noise, including equipment backup alarms, dust and ground vibration.
    • The contractor will coordinate with property and business owners to maintain access or provide alternative access.
    • Utility work


    Learn More


  • June 2023 Public Outreach

    Share June 2023 Public Outreach on Facebook Share June 2023 Public Outreach on Twitter Share June 2023 Public Outreach on Linkedin Email June 2023 Public Outreach link

    Please review the information below to learn more about the project and provide comments. While your comments are always welcome, the comment period closed on June 29, 2023.


  • Commission Adoption

    Share Commission Adoption on Facebook Share Commission Adoption on Twitter Share Commission Adoption on Linkedin Email Commission Adoption link

    The Rose Hill Temporary Traffic Calming Study was adopted by the ACHD Commission on September 28, 2022.


  • June 2022 Public Outreach

    Share June 2022 Public Outreach on Facebook Share June 2022 Public Outreach on Twitter Share June 2022 Public Outreach on Linkedin Email June 2022 Public Outreach link

    Based on public feedback from outreach earlier this year, several alternatives were developed. In June 2023 the alternatives were presented to the public. The comment period closed on June 23, 2022.


    June 16th Virtual Meetings - Watch the Recordings!

    After reviewing the information, watch the June 16 virtual meeting recordings where we answered participant questions. Please note that there is a short registration process to complete before viewing the videos.

Page last updated: 15 Nov 2024, 10:52 AM