2022 Pavement and Pedestrian Improvements
This project is substantially complete.
The Ada County Highway District (ACHD) will be reconstructing several streets in Ada County as part of a federal aid project to improve pavement conditions and upgrade the streets for all users.
Work could include:
- Reconstructing streets or removing and replacing pavement to improve roadway conditions
- Filling in sidewalk gaps to increase connectivity
- Adding bulb-outs and signalized pedestrian crossings where appropriate to improve safety
- Installing Accessible Pedestrian Signals (APS) and pedestrian push buttons.
- Upgrading and/or installing pedestrian ramps to meet modern standards and the Americans with Disabilities Act (ADA).
Street Segments:
- 9th St., Idaho St. to Bannock St. - Replace existing asphalt with concrete; install pedestrian bulb outs; replace existing pedestrian ramps; replace existing driveway approaches and traffic signals.
- 20th St., Lemp St. to Irene St. - Reconstruct roadway; replace existing pedestrian ramps; replace damaged sidewalk
- Amity Rd., Enterprise St. to Production St. - Reconstruct roadway
- Bluegrass Ave., Ellen's Ferry Dr. to Castle Dr. - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps
- Castle Hill Way, Castle Dr. to Drawbridge Dr. - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps; replace existing driveway approach
- Drawbridge Dr., West End to Castle Hill Way - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps
- Enterprise St., Amity Rd. to Commerce Ave. - Reconstruct roadway; replace existing pedestrian ramp
- Maple Grove Rd., I-84 Bridge to Franklin Rd. - Remove and replace pavement; install a pedestrian hybrid beacon at Maple Grove and Shoup; replace existing pedestrian ramps
- Morris Hill Rd., west of Liberty St. to Hartman St. - Reconstruct roadway; replace existing pedestrian ramps
- Roosevelt St., Emerald St. to Irving St. - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps; install new sidewalk to fill gaps; replace existing driveway approaches; rebuild existing speed humps
- Spaulding St., Phillippi St. to Orchard St. - Reconstruct roadway; install bulb-outs; replace existing pedestrian ramps; rebuild existing speed humps
- Turret Way, Drawbridge Dr. to Castle Dr. - Reconstruct roadway; install bulb-outs; replace existing pedestrian ramps
Commuters are reminded to obey all road closure signs and follow the signs along the detour route. Commuters should never attempt to drive, bike, or walk on closed portions of the road, regardless of whether there appears to be active construction. It is unlawful to move or manipulate construction signs and doing so can put commuters and construction workers at great risk.
The Ada County Highway District (ACHD) will be reconstructing several streets in Ada County as part of a federal aid project to improve pavement conditions and upgrade the streets for all users.
Work could include:
- Reconstructing streets or removing and replacing pavement to improve roadway conditions
- Filling in sidewalk gaps to increase connectivity
- Adding bulb-outs and signalized pedestrian crossings where appropriate to improve safety
- Installing Accessible Pedestrian Signals (APS) and pedestrian push buttons.
- Upgrading and/or installing pedestrian ramps to meet modern standards and the Americans with Disabilities Act (ADA).
Street Segments:
- 9th St., Idaho St. to Bannock St. - Replace existing asphalt with concrete; install pedestrian bulb outs; replace existing pedestrian ramps; replace existing driveway approaches and traffic signals.
- 20th St., Lemp St. to Irene St. - Reconstruct roadway; replace existing pedestrian ramps; replace damaged sidewalk
- Amity Rd., Enterprise St. to Production St. - Reconstruct roadway
- Bluegrass Ave., Ellen's Ferry Dr. to Castle Dr. - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps
- Castle Hill Way, Castle Dr. to Drawbridge Dr. - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps; replace existing driveway approach
- Drawbridge Dr., West End to Castle Hill Way - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps
- Enterprise St., Amity Rd. to Commerce Ave. - Reconstruct roadway; replace existing pedestrian ramp
- Maple Grove Rd., I-84 Bridge to Franklin Rd. - Remove and replace pavement; install a pedestrian hybrid beacon at Maple Grove and Shoup; replace existing pedestrian ramps
- Morris Hill Rd., west of Liberty St. to Hartman St. - Reconstruct roadway; replace existing pedestrian ramps
- Roosevelt St., Emerald St. to Irving St. - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps; install new sidewalk to fill gaps; replace existing driveway approaches; rebuild existing speed humps
- Spaulding St., Phillippi St. to Orchard St. - Reconstruct roadway; install bulb-outs; replace existing pedestrian ramps; rebuild existing speed humps
- Turret Way, Drawbridge Dr. to Castle Dr. - Reconstruct roadway; install bulb-outs; replace existing pedestrian ramps
Commuters are reminded to obey all road closure signs and follow the signs along the detour route. Commuters should never attempt to drive, bike, or walk on closed portions of the road, regardless of whether there appears to be active construction. It is unlawful to move or manipulate construction signs and doing so can put commuters and construction workers at great risk.
This project is substantially complete.
-
April 28, 2023
Share April 28, 2023 on Facebook Share April 28, 2023 on Twitter Share April 28, 2023 on Linkedin Email April 28, 2023 link- 9th St., Idaho St. to Bannock St. - Replace existing asphalt with concrete; install pedestrian bulb outs; replace existing pedestrian ramps; replace existing driveway approaches
- 20th St., Lemp St. to Irene St. - Reconstruct roadway; replace existing pedestrian ramps; replace damaged sidewalk
- Amity Rd., Enterprise St. to Production St. - Reconstruct roadway
- Bluegrass Ave., Ellen's Ferry Dr. to Castle Dr. - Contractor is working on storm drain improvements. Bluegrass Ave and Elmer St will be closed May 1st - May 3rd. Bluegrass Ave & Castle Dr. will be closed May 4th - May 5th.
- Castle Hill Way, Castle Dr. to Drawbridge Dr. - Waterline work by Veolia April 24th and is ongoing. Castle Hill way will be closed during Veolia's work.
- Drawbridge Dr., West End to Castle Hill Way - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps
- Enterprise St., Amity Rd. to Commerce Ave. - Reconstruct roadway; replace existing pedestrian ramp
- Maple Grove Rd., I-84 Bridge to Franklin Rd. - Concrete work started April 5th. Lane restrictions will be in place for the duration of the work. Roadway work is scheduled to begin June 8th. Maple Grove Road will be closed during the work, which is anticipated to last a month.
- Morris Hill Rd., west of Liberty St. to Hartman St. - Concrete work is ongoing. Pipework is complete. Spaulding Street, Philippi Street to Orchard Street - Pipework and concrete work is complete. Roadway work is anticipated to start May 8th. Spaulding Street will be closed during the work, which is anticipated to last a month.
- Roosevelt St., Emerald St. to Irving St. - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps; install new sidewalk to fill gaps; replace existing driveway approaches; rebuild existing speed humps
- Spaulding St., Phillippi St. to Orchard St. - Reconstruct roadway; install bulb-outs; replace existing pedestrian ramps; rebuild existing speed humps
- Turret Way, Drawbridge Dr. to Castle Dr. - Waterline work by Veolia is anticipated to start May 1st. Turret Way will be closed during Veolia's work.
-
April 21, 2023
Share April 21, 2023 on Facebook Share April 21, 2023 on Twitter Share April 21, 2023 on Linkedin Email April 21, 2023 link- 9th St., Idaho St. to Bannock St. - Complete.
- 20th St., Lemp St. to Irene St. - Reconstruct roadway; replace existing pedestrian ramps; replace damaged sidewalk
- Amity Rd., Enterprise St. to Production St. - Reconstruct roadway
- Bluegrass Ave., Ellen's Ferry Dr. to Castle Dr. - Waterline work by Veolia at Bluegrass and Elmer started April 17th. Bluegrass will be closed between Elmer and Castle Drive.
- Castle Hill Way, Castle Dr. to Drawbridge Dr. - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps; replace existing driveway approach
- Drawbridge Dr., West End to Castle Hill Way - Waterline work by Veolia is schedule to begin April 24th. Castel Hill Way will be closed during the work.
- Enterprise St., Amity Rd. to Commerce Ave. - Reconstruct roadway; replace existing pedestrian ramp
- Maple Grove Rd., I-84 Bridge to Franklin Rd. - Concrete work started April 5th. Lane restrictions will be in place for the duration of the work. Patching curb. Lane restrictions switching side on April 24th.
- Morris Hill Rd., west of Liberty St. to Hartman St. - Concrete work is ongoing. Pipe work complete. Patching trench.
- Roosevelt St., Emerald St. to Irving St. - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps; install new sidewalk to fill gaps; replace existing driveway approaches; rebuild existing speed humps
- Spaulding St., Phillippi St. to Orchard St. - Waterline replacement by Veolia started February 27th in advance of ACHD's project. Concrete work is complete. Pipe work is complete.
- Turret Way, Drawbridge Dr. to Castle Dr. - Reconstruct roadway; install bulb-outs; replace existing pedestrian ramps
-
April 14, 2023
Share April 14, 2023 on Facebook Share April 14, 2023 on Twitter Share April 14, 2023 on Linkedin Email April 14, 2023 link- 9th St., Idaho St. to Bannock St. - Replace existing asphalt with concrete; install pedestrian bulb outs; replace existing pedestrian ramps; replace existing driveway approaches
- 20th St., Lemp St. to Irene St. - Reconstruct roadway; replace existing pedestrian ramps; replace damaged sidewalk
- Amity Rd., Enterprise St. to Production St. - Reconstruct roadway
- Bluegrass Ave., Ellen's Ferry Dr. to Castle Dr. - Waterline work by Veolia at Bluegrass and Peachtree began April 11th. The intersection will be closed during the work. Waterline work by Veolia at Bluegrass and Elmer is scheduled to begin April 17th. Bluegrass will be closed between Elmer and Castle Drive.
- Castle Hill Way, Castle Dr. to Drawbridge Dr. - Waterline work by Veolia is scheduled to begin April 24th. Castle Hill Way will be closed during the work.
- Drawbridge Dr., West End to Castle Hill Way - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps
- Enterprise St., Amity Rd. to Commerce Ave. - Reconstruct roadway; replace existing pedestrian ramp
- Maple Grove Rd., I-84 Bridge to Franklin Rd. - Concrete work started April 5th. Lane restrictions will be in place for the duration of the work.
- Morris Hill Rd., west of Liberty St. to Hartman St. - Concrete work is ongoing. Road is closed for pipework.
- Roosevelt St., Emerald St. to Irving St. - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps; install new sidewalk to fill gaps; replace existing driveway approaches; rebuild existing speed humps
- Spaulding St., Phillippi St. to Orchard St. - Water line replacement by Veolia has started February 27th in advance of ACHD's project. Concrete work is complete. Pipe work is complete.
- Turret Way, Drawbridge Dr. to Castle Dr. - Reconstruct roadway; install bulb-outs; replace existing pedestrian ramps
-
April 7, 2023
Share April 7, 2023 on Facebook Share April 7, 2023 on Twitter Share April 7, 2023 on Linkedin Email April 7, 2023 link- 9th St., Idaho St. to Bannock St. - Replace existing asphalt with concrete; install pedestrian bulb outs; replace existing pedestrian ramps; replace existing driveway approaches
- 20th St., Lemp St. to Irene St. - Reconstruct roadway; replace existing pedestrian ramps; replace damaged sidewalk
- Amity Rd., Enterprise St. to Production St. - Reconstruct roadway
- Bluegrass Ave., Ellen's Ferry Dr. to Castle Dr. - Waterline work by Veolia at Bluegrass and Peachtree is scheduled to begin April 10th. The intersection will be closed during that work. Waterline work by Veolia at Bluegrass and Elmer is scheduled to begin April 17th. Bluegrass will be closed between Elmer and Castle Drive.
- Castle Hill Way, Castle Dr. to Drawbridge Dr. - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps; replace existing driveway approach
- Drawbridge Dr., West End to Castle Hill Way - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps
- Enterprise St., Amity Rd. to Commerce Ave. - Reconstruct roadway; replace existing pedestrian ramp
- Maple Grove Rd., I-84 Bridge to Franklin Rd. - Concrete work started April 5th. Lane restrictions will be in place for the duration of the work.
- Morris Hill Rd., west of Liberty St. to Hartman St. - Concrete work started April 4th. Road will be closed the week of April 10th for pipe work.
- Roosevelt St., Emerald St. to Irving St. - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps; install new sidewalk to fill gaps; replace existing driveway approaches; rebuild existing speed humps
- Spaulding St., Phillippi St. to Orchard St. - Waterline replacement by Veolia February 27th in advance of ACHD's project. The roadway is closed during that road work. Concrete work is nearly complete. Pipe work is scheduled for the week of April 3rd.
- Turret Way, Drawbridge Dr. to Castle Dr. - Reconstruct roadway; install bulb-outs; replace existing pedestrian ramps
-
March 31, 2023
Share March 31, 2023 on Facebook Share March 31, 2023 on Twitter Share March 31, 2023 on Linkedin Email March 31, 2023 link- 9th St., Idaho St. to Bannock St. - Replace existing asphalt with concrete; install pedestrian bulb outs; replace existing pedestrian ramps; replace existing driveway approaches
- 20th St., Lemp St. to Irene St. - Reconstruct roadway; replace existing pedestrian ramps; replace damaged sidewalk
- Amity Rd., Enterprise St. to Production St. - Reconstruct roadway
- Bluegrass Ave., Ellen's Ferry Dr. to Castle Dr. - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps
- Castle Hill Way, Castle Dr. to Drawbridge Dr. - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps; replace existing driveway approach
- Drawbridge Dr., West End to Castle Hill Way - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps
- Enterprise St., Amity Rd. to Commerce Ave. - Reconstruct roadway; replace existing pedestrian ramp
- Maple Grove Rd., I-84 Bridge to Franklin Rd. - Remove and replace pavement; install a pedestrian hybrid beacon at Maple Grove and Shoup; replace existing pedestrian ramps
- Morris Hill Rd., west of Liberty St. to Hartman St. - Concrete work is scheduled to begin the week of March 27th. Road will be closed the week of April 10th for pipe work.
- Roosevelt St., Emerald St. to Irving St. - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps; install new sidewalk to fill gaps; replace existing driveway approaches; rebuild existing speed humps
- Spaulding St., Phillippi St. to Orchard St. - Water line replacement by Veolia started February 27th in advance of ACHD's project. Concrete work is ongoing. Pipe work is scheduled for the week of April 3rd.
- Turret Way, Drawbridge Dr. to Castle Dr. - Reconstruct roadway; install bulb-outs; replace existing pedestrian ramps
-
March 24, 2023
Share March 24, 2023 on Facebook Share March 24, 2023 on Twitter Share March 24, 2023 on Linkedin Email March 24, 2023 link- 9th St., Idaho St. to Bannock St. - Replace existing asphalt with concrete; install pedestrian bulb outs; replace existing pedestrian ramps; replace existing driveway approaches
- 20th St., Lemp St. to Irene St. - Reconstruct roadway; replace existing pedestrian ramps; replace damaged sidewalk
- Amity Rd., Enterprise St. to Production St. - Reconstruct roadway
- Bluegrass Ave., Ellen's Ferry Dr. to Castle Dr. - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps
- Castle Hill Way, Castle Dr. to Drawbridge Dr. - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps; replace existing driveway approach
- Drawbridge Dr., West End to Castle Hill Way - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps
- Enterprise St., Amity Rd. to Commerce Ave. - Reconstruct roadway; replace existing pedestrian ramp
- Maple Grove Rd., I-84 Bridge to Franklin Rd. - Remove and replace pavement; install a pedestrian hybrid beacon at Maple Grove and Shoup; replace existing pedestrian ramps
- Morris Hill Rd., west of Liberty St. to Hartman St. - Concrete work is expected to begin the week of March 20th.
- Roosevelt St., Emerald St. to Irving St. - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps; install new sidewalk to fill gaps; replace existing driveway approaches; rebuild existing speed humps
- Spaulding St., Phillippi St. to Orchard St. - Water line replacement by Veolia started February 27th in advance of ACHD's project. Concrete work is scheduled to begin the week of March 20th.
- Turret Way, Drawbridge Dr. to Castle Dr. - Reconstruct roadway; install bulb-outs; replace existing pedestrian ramps
-
March 17, 2022
Share March 17, 2022 on Facebook Share March 17, 2022 on Twitter Share March 17, 2022 on Linkedin Email March 17, 2022 link- 9th St., Idaho St. to Bannock St. - Replace existing asphalt with concrete; install pedestrian bulb outs; replace existing pedestrian ramps; replace existing driveway approaches
- 20th St., Lemp St. to Irene St. - Reconstruct roadway; replace existing pedestrian ramps; replace damaged sidewalk
- Amity Rd., Enterprise St. to Production St. - Reconstruct roadway
- Bluegrass Ave., Ellen's Ferry Dr. to Castle Dr. - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps
- Castle Hill Way, Castle Dr. to Drawbridge Dr. - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps; replace existing driveway approach
- Drawbridge Dr., West End to Castle Hill Way - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps
- Enterprise St., Amity Rd. to Commerce Ave. - Reconstruct roadway; replace existing pedestrian ramp
- Maple Grove Rd., I-84 Bridge to Franklin Rd. - Remove and replace pavement; install a pedestrian hybrid beacon at Maple Grove and Shoup; replace existing pedestrian ramps
- Morris Hill Rd., west of Liberty St. to Hartman St. - Concrete work is scheduled to begin the week of March 20th.
- Roosevelt St., Emerald St. to Irving St. - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps; install new sidewalk to fill gaps; replace existing driveway approaches; rebuild existing speed humps
- Spaulding St., Phillippi St. to Orchard St. - Waterline replacement by Veolia started February 27th in advance of ACHD's project. Concrete work is scheduled to begin the week of March 20th.
- Turret Way, Drawbridge Dr. to Castle Dr. - Reconstruct roadway; install bulb-outs; replace existing pedestrian ramps
-
March 10, 2023
Share March 10, 2023 on Facebook Share March 10, 2023 on Twitter Share March 10, 2023 on Linkedin Email March 10, 2023 link- 9th St., Idaho St. to Bannock St. - Replace existing asphalt with concrete; install pedestrian bulb outs; replace existing pedestrian ramps; replace existing driveway approaches
- 20th St., Lemp St. to Irene St. - Reconstruct roadway; replace existing pedestrian ramps; replace damaged sidewalk
- Amity Rd., Enterprise St. to Production St. - Reconstruct roadway
- Bluegrass Ave., Ellen's Ferry Dr. to Castle Dr. - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps
- Castle Hill Way, Castle Dr. to Drawbridge Dr. - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps; replace existing driveway approach
- Drawbridge Dr., West End to Castle Hill Way - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps
- Enterprise St., Amity Rd. to Commerce Ave. - Reconstruct roadway; replace existing pedestrian ramp
- Maple Grove Rd., I-84 Bridge to Franklin Rd. - Remove and replace pavement; install a pedestrian hybrid beacon at Maple Grove and Shoup; replace existing pedestrian ramps
- Morris Hill Rd., west of Liberty St. to Hartman St. - Concrete work is anticipated to begin March 29th.
- Roosevelt St., Emerald St. to Irving St. - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps; install new sidewalk to fill gaps; replace existing driveway approaches; rebuild existing speed humps
- Spaulding St., Phillippi St. to Orchard St. - Waterline replacement by Veolia started February 27th in advance of ACHD's project. Concrete work is scheduled to begin March 20th.
- Turret Way, Drawbridge Dr. to Castle Dr. - Reconstruct roadway; install bulb-outs; replace existing pedestrian ramps
-
March 3, 2023
Share March 3, 2023 on Facebook Share March 3, 2023 on Twitter Share March 3, 2023 on Linkedin Email March 3, 2023 link- 9th St., Idaho St. to Bannock St.
- 20th St., Lemp St. to Irene St.
- Amity Rd., Enterprise St. to Production St.
- Bluegrass Ave., Ellen's Ferry Dr. to Castle Dr.
- Castle Hill Way, Castle Dr. to Drawbridge Dr.
- Drawbridge Dr., West End to Castle Hill Way
- Enterprise St., Amity Rd. to Commerce Ave.
- Maple Grove Rd., I-84 Bridge to Franklin Rd.
- Morris Hill Rd., west of Liberty St. to Hartman St.
- Roosevelt St., Emerald St. to Irving St.
-
Spaulding St., Phillippi St. to Orchard St. - Reconstruct roadway; install bulb-outs; replace existing pedestrian ramps; rebuild existing speed humps
- Water line replacement by Veolia started February 27th in advance of ACHD's project.
- Turret Way, Drawbridge Dr. to Castle Dr.
-
December 29, 2022
Share December 29, 2022 on Facebook Share December 29, 2022 on Twitter Share December 29, 2022 on Linkedin Email December 29, 2022 linkStarting February 2023, the Ada County Highway District (ACHD) will be reconstructing several streets as part of the 2022 Pavement and Pedestrian Improvements Project. Construction is anticipated to end fall of 2023.
Who's Listening
-
Construction Supervisor
Phone 208-387-6100 Email projects@achdidaho.org -
Community and Business Relations Coordinator
Phone 208-387-6100 Email projects@achdidaho.org
Documents
- Fall 2021 Public Outreach
-
Project Designs
- 9th St., Idaho St. to Bannock St. Design (440 KB) (pdf)
- 20th St., Lemp St. to Irene St. Design (942 KB) (pdf)
- Amity Rd., Enterprise St. to Production St. Design (577 KB) (pdf)
- Bluegrass Ave., Ellen's Ferry Dr. to Castle Dr. Design (653 KB) (pdf)
- Castle Hill Way, Castle Dr. to Drawbridge Dr. Design (740 KB) (pdf)
- Drawbridge Dr., West End to Castle Hill Way Design (634 KB) (pdf)
- Enterprise St., Amity Rd. to Commerce Ave. Design (562 KB) (pdf)
- Maple Grove Rd., I-84 Bridge to Franklin Rd. Design (647 KB) (pdf)
- Morris Hill Rd., west of Liberty St. to Hartman St. Design (435 KB) (pdf)
- Spaulding St., Phillippi St. to Orchard St. Design (536 KB) (pdf)
- Roosevelt St., Emerald St. to Irving St. Design (499 KB) (pdf)
- Turret Way, Drawbridge Dr. to Castle Dr. Design (694 KB) (pdf)
Timeline
-
2021
2022 Pavement and Pedestrian Improvements has finished this stageDesign started
-
Fall 2021
2022 Pavement and Pedestrian Improvements has finished this stageSeek public feedback
-
2022
2022 Pavement and Pedestrian Improvements has finished this stageFinalize design
-
2022/2023
2022 Pavement and Pedestrian Improvements is currently at this stageConstruction