2025 Meridian Downtown Pavement and Pedestrian Improvements
This Project is substantially complete
The Ada County Highway District (ACHD) will be repaving or reconstructing several streets in Meridian as part of a locally funded project to improve pavement conditions and upgrade the streets for all users.
Work could include
- Filling in sidewalk gaps and replacing deteriorated sidewalk to improve connectivity
- Adding bulb-outs and narrowing travel lanes where appropriate to improve safety
- Upgrading and/or installing pedestrian ramps to meet modern standards and the Americans with Disabilities Act (ADA)
- Adding crosswalk markings for school walk route crossings
- Stormwater and irrigation upgrades to improve flows
Street Segments
- Broadway Avenue, East 3rd Street to East 6th Street
- Cherry Avenue, West 4th Street to Meridian Road
- East 2nd Street, Idaho Avenue to Pine Avenue
- East 4th Street, Broadway Avenue to State Avenue
- Idaho Avenue, West 8th Street to Meridian Road
- Maple Avenue, West 1st Street to Meridian Road
- West 2nd Street, Cherry Avenue to Cherry Lane
- West 3rd Street, Pine Street to North End
- West 4th Street, Broadway Avenue to North of Maple Avenue
- West 5th Street, Carlton Avenue to Washington Street
- West 6th Street, Carlton Avenue to Washington Street
- West 7th Street, Washington Street to the pathway South of McFadden Avenue
- Washington Street, West 7th Street to Meridian Road
To arrange for a translator or other accommodation, contact ACHD at (208) 387-6100 | TTY 1-800-377-3529 | projects@achdidaho.org.
Se les recomienda a las personas que necesiten un intérprete o arreglos especiales que llamen a la coordinadora de participación pública, al (208) 387-6100 | TTY 1-800-377-3529 | projects@achdidaho.org
The Ada County Highway District (ACHD) will be repaving or reconstructing several streets in Meridian as part of a locally funded project to improve pavement conditions and upgrade the streets for all users.
Work could include
- Filling in sidewalk gaps and replacing deteriorated sidewalk to improve connectivity
- Adding bulb-outs and narrowing travel lanes where appropriate to improve safety
- Upgrading and/or installing pedestrian ramps to meet modern standards and the Americans with Disabilities Act (ADA)
- Adding crosswalk markings for school walk route crossings
- Stormwater and irrigation upgrades to improve flows
Street Segments
- Broadway Avenue, East 3rd Street to East 6th Street
- Cherry Avenue, West 4th Street to Meridian Road
- East 2nd Street, Idaho Avenue to Pine Avenue
- East 4th Street, Broadway Avenue to State Avenue
- Idaho Avenue, West 8th Street to Meridian Road
- Maple Avenue, West 1st Street to Meridian Road
- West 2nd Street, Cherry Avenue to Cherry Lane
- West 3rd Street, Pine Street to North End
- West 4th Street, Broadway Avenue to North of Maple Avenue
- West 5th Street, Carlton Avenue to Washington Street
- West 6th Street, Carlton Avenue to Washington Street
- West 7th Street, Washington Street to the pathway South of McFadden Avenue
- Washington Street, West 7th Street to Meridian Road
To arrange for a translator or other accommodation, contact ACHD at (208) 387-6100 | TTY 1-800-377-3529 | projects@achdidaho.org.
Se les recomienda a las personas que necesiten un intérprete o arreglos especiales que llamen a la coordinadora de participación pública, al (208) 387-6100 | TTY 1-800-377-3529 | projects@achdidaho.org
This Project is substantially complete
-
September 12, 2025
Share September 12, 2025 on Facebook Share September 12, 2025 on Twitter Share September 12, 2025 on Linkedin Email September 12, 2025 link- Broadway Ave, E 3rd Street to E 6th Street - Complete.
- Cherry Ave, NW 4th Street to Meridian Rd - Complete.
- Idaho Ave, W 8th St to Meridian Rd - Milling complete. Demo for sidewalk complete. Working on storm drain installation.
- Maple Ave, W 1st Street to Meridian Rd - Complete.
- Washington St, NW 7th Street to Meridian Rd - Complete.
- E 2nd Street, Idaho Ave to Pine Ave - Complete.
- E 4th Street, Broadway Ave to State Ave - Complete.
- W 2nd Street, Cherry Ave to Cherry Lane - Grade prep and curb and gutter install ongoing.
- W 3rd Street, Pine Ave to north end - Complete.
- NW 4th Street, Broadway Ave to Maple Ave - Complete.
- NW 6th Street, Carlton Ave to Washington St - Complete.
- NW 7th Street, McFadden Ave to Washington St - Complete.
-
September 5, 2025
Share September 5, 2025 on Facebook Share September 5, 2025 on Twitter Share September 5, 2025 on Linkedin Email September 5, 2025 link- Broadway Ave, E 3rd Street to E 6th Street - Complete
- Cherry Ave, NW 4th Street to Meridian Rd - Complete
- Idaho Ave, W 8th St to Meridian Rd - Milling complete. Demo for sidewalk complete. Working on storm drain installation. Utility work will be completed this week.
- Maple Ave, W 1st Street to Meridian Rd - Complete
- Washington St, NW 7th Street to Meridian Rd - Complete
- E 2nd Street, Idaho Ave to Pine Ave - Complete
- E 4th Street, Broadway Ave to State Ave - Complete
- W 2nd Street, Cherry Ave to Cherry Lane - Grade prep and curb and gutter install ongoing.
- W 3rd Street, Pine Ave to north end - Complete
- NW 4th Street, Broadway Ave to Maple Ave - Complete
- NW 6th Street, Carlton Ave to Washington St - Complete
- NW 7th Street, McFadden Ave to Washington St - Complete
-
August 29, 2025
Share August 29, 2025 on Facebook Share August 29, 2025 on Twitter Share August 29, 2025 on Linkedin Email August 29, 2025 link- Broadway Ave, E 3rd Street to E 6th Street - Complete.
- Cherry Ave, NW 4th Street to Meridian Rd - Complete.
- Idaho Ave, W 8th St to Meridian Rd - Milling complete. Demo for sidewalk complete. Working on storm drain installation. Utility work will be completed this week.
- Maple Ave, W 1st Street to Meridian Rd - Complete.
- Washington St, NW 7th Street to Meridian Rd - Complete.
- E 2nd Street, Idaho Ave to Pine Ave - Complete.
- E 4th Street, Broadway Ave to State Ave - Complete.
- W 2nd Street, Cherry Ave to Cherry Lane - Milling complete. Utility work complete. Concrete placements ongoing. Grade prep ongoing. Working on storm drain install.
- W 3rd Street, Pine Ave to north end - Complete.
- NW 4th Street, Broadway Ave to Maple Ave - Complete.
- NW 6th Street, Carlton Ave to Washington St - Complete.
- NW 7th Street, McFadden Ave to Washington St - Complete.
-
August 21, 2025
Share August 21, 2025 on Facebook Share August 21, 2025 on Twitter Share August 21, 2025 on Linkedin Email August 21, 2025 link- Broadway Ave, E 3rd Street to E 6th Street - Complete.
- Cherry Ave, NW 4th Street to Meridian Rd - Complete.
- Idaho Ave, W 8th St to Meridian Rd - Milling complete. Demo for sidewalk complete. Working on storm drain installation. Utility work will be completed this week.
- Maple Ave, W 1st Street to Meridian Rd - Complete.
- Washington St, NW 7th Street to Meridian Rd - Complete.
- E 2nd Street, Idaho Ave to Pine Ave - Complete.
- E 4th Street, Broadway Ave to State Ave - Complete.
- W 2nd Street, Cherry Ave to Cherry Lane - Milling complete. Utility work complete. Concrete placements ongoing. Grade prep ongoing. Working on storm drain install.
- W 3rd Street, Pine Ave to north end - Complete.
- NW 4th Street, Broadway Ave to Maple Ave - Complete.
- NW 6th Street, Carlton Ave to Washington Street - Complete.
- NW 7th Street, McFadden Ave to Washington St - Complete.
-
August 15, 2025
Share August 15, 2025 on Facebook Share August 15, 2025 on Twitter Share August 15, 2025 on Linkedin Email August 15, 2025 link- Broadway Ave, E 3rd Street to E 6th Street - Complete.
- Cherry Ave, NW 4th Street to Meridian Rd - Complete.
- Idaho Ave, W 8th St to Meridian Rd - Milling complete. Demo for sidewalk started. Working on storm drain install.
- Maple Ave, W 1st Street to Meridian Rd - Complete.
- Washington St, NW 7th Street to Meridian Rd - Paving scheduled for Friday.
- E 2nd Street, Idaho Ave to Pine Ave - Complete.
- E 4th Street, Broadway Ave to State Ave - Complete.
- W 2nd Street, Cherry Ave to Cherry Lane - Milling complete. Utility work complete. Concrete placements ongoing. Grade prep ongoing. Working on storm drain install.
- W 3rd Street, Pine Ave to north end - Complete.
- NW 4th Street, Broadway Ave to Maple Ave - Complete.
- NW 6th Street, Carlton Ave to Washington St - Complete.
- NW 7th Street, McFadden Ave to Washington St - Complete.
-
August 8, 2025
Share August 8, 2025 on Facebook Share August 8, 2025 on Twitter Share August 8, 2025 on Linkedin Email August 8, 2025 link- Broadway Ave, E 3rd Street to E 6th Street - Complete.
- Cherry Ave, NW 4th Street to Meridian Rd - Complete.
- Idaho Ave, W 8th St to Meridian Rd - Milling complete. Demo for sidewalk started.
- Maple Ave, W 1st Street to Meridian Rd - Complete.
- Washington St, NW 7th Street to Meridian Rd - Grade prep complete. Utility work complete. Concrete prep and placements ongoing. Grade prep ongoing.
- E 2nd Street, Idaho Ave to Pine Ave - Complete.
- E 4th Street, Broadway Ave to State Ave - Complete.
- W 2nd Street, Cherry Ave to Cherry Lane - Milling complete. Utility work complete. Concrete placements ongoing. Grade prep ongoing.
- W 3rd Street, Pine Ave to north end - Complete.
- NW 4th Street, Broadway Ave to Maple Ave - Complete.
- NW 6th Street, Carlton Ave to Washington St - Complete.
- NW 7th Street, McFadden Ave to Washington St - Complete.
-
August 1, 2025
Share August 1, 2025 on Facebook Share August 1, 2025 on Twitter Share August 1, 2025 on Linkedin Email August 1, 2025 link- Broadway Ave, E 3rd Street to E 6th Street - Complete.
- Cherry Ave, NW 4th Street to Meridian Rd - Complete.
- Idaho Ave, W 8th St to Meridian Rd - Milling complete.
- Maple Ave, W 1st Street to Meridian Rd - Complete.
- Washington St, NW 7th Street to Meridian Rd - Grade prep complete. Utility work complete. Concrete prep and placements ongoing.
- E 2nd Street, Idaho Ave to Pine Ave - Complete.
- 4th Street, Broadway Ave to State Ave - Demo, utility work, and grade prep complete. Concrete placements complete. Paving this week.
- W 2nd Street, Cherry Ave to Cherry Lane - Milling complete. Utility work complete. Concrete complete. Grade prep ongoing.
- W 3rd Street, Pine Ave to north end - Site prep complete. Concrete placements minor work remains. Pine will be closed starting June 24th. Broadway will be the detour. Paving this week.
- NW 4th Street, Broadway Ave to Maple Ave - Complete.
- NW 6th Street, Carlton Ave to Washington St - Demo complete. Utility work complete. Concrete placements ongoing.
- NW 7th Street, McFadden Ave to Washington St - Demo and utility work complete.
-
July 25, 2025
Share July 25, 2025 on Facebook Share July 25, 2025 on Twitter Share July 25, 2025 on Linkedin Email July 25, 2025 link- Broadway Ave, E 3rd Street to E 6th Street - Complete.
- Cherry Ave, NW 4th Street to Meridian Rd - Complete.
- Idaho Ave, W 8th St to Meridian Rd - Milling complete.
- Maple Ave, W 1st Street to Meridian Rd - Complete.
- Washington St, NW 7th Street to Meridian Rd - Grade prep complete. Utility work complete. Concrete prep and placements ongoing.
- E 2nd Street, Idaho Ave to Pine Ave - Complete.
- E 4th Street, Broadway Ave to State Ave - Demo, utility work, and grade prep complete. Concrete placements complete. Paving next week.
- W 2nd Street, Cherry Ave to Cherry Lane - Milling complete. Utility work complete. Concrete complete. Paving next week.
- W 3rd Street, Pine Ave to north end - Site prep complete. Concrete placements minor work remains. Pine will be closed starting June 24th. Broadway will be the detour. Paving next week.
- NW 4th Street, Broadway Ave to Maple Ave - Complete.
- NW 6th Street, Carlton Ave to Washington St - Demo complete. Utility work complete. Concrete placements ongoing.
- NW 7th Street, McFadden Ave to Washington St - Demo and utility work complete. Concrete placements ongoing
-
July 18, 2025
Share July 18, 2025 on Facebook Share July 18, 2025 on Twitter Share July 18, 2025 on Linkedin Email July 18, 2025 linkProject includes work on the following segments:
- Broadway Ave, E 3rd Street to E 6th Street - Complete
- Cherry Ave, NW 4th Street to Meridian Rd - Complete
- Idaho Ave, W 8th St to Meridian Rd - Complete
- Maple Ave, W 1st Street to Meridian Rd - Complete
- Washington St, NW 7th Street to Meridian Rd
- Grade prep complete.
- Utility work complete.
- Concrete prep and placements ongoing.
- E 2nd Street, Idaho Ave to Pine Ave - Complete
- E 4th Street, Broadway Ave to State Ave
- Demo, utility work, and grade prep are ongoing.
- Concrete placements are ongoing.
-
W 2nd Street, Cherry Ave to Cherry Lane
- Milling complete.
- Utility work started.
-
W 3rd Street, Pine Ave to north end
- Site prep ongoing.
- Concrete placements have started.
-
Pine will be closed starting June 24th. Broadway will be the detour.
- NW 4th Street, Broadway Ave to Maple Ave - Complete
-
NW 6th Street, Carlton Ave to Washington St
- Demo complete.
- Utility work complete.
- Concrete placements ongoing.
-
NW 7th Street, McFadden Ave to Washington St
- Demo and utility work complete.
- Concrete placements ongoing.
-
July 11, 2025
Share July 11, 2025 on Facebook Share July 11, 2025 on Twitter Share July 11, 2025 on Linkedin Email July 11, 2025 link- Broadway Ave, E 3rd Street to E 6th Street - Complete.
- Cherry Ave, NW 4th Street to Meridian Rd - Complete.
- Idaho Ave, W 8th St to Meridian Rd - Milling complete.
- Maple Ave, W 1st Street to Meridian Rd - Complete.
- Washington St, NW 7th Street to Meridian Rd -Grade prep complete. Utility work complete. Concrete prep and placements ongoing.
- E 2nd Street, Idaho Ave to Pine Ave - Complete.
- E 4th Street, Broadway Ave to State Ave - Demo, utility work, and grade prep are ongoing. Concrete placements are ongoing.
- W 2nd Street, Cherry Ave to Cherry Lane - Milling complete. Utility work started.
- W 3rd Street, Pine Ave to north end - Site prep ongoing. Concrete placements have started. Pine will be closed starting June 24th. Broadway will be the detour.
- NW 4th Street, Broadway Ave to Maple Ave - Complete.
- NW 6th Street, Carlton Ave to Washington St - Demo complete. Utility work complete. Concrete placements ongoing.
- NW 7th Street, McFadden Ave to Washington St - Demo and utility work complete. Concrete placements have started.
Documents
-
Winter 2024 Update
-
Broadway (E 3rd St to E 6th St).pdf (2.48 MB) (pdf)
-
Cherry (W 4th to Meridian).pdf (4.69 MB) (pdf)
-
E 2nd St (Idaho Ave to Pine Ave).pdf (2.68 MB) (pdf)
-
E 4th Street (Broadway Ave to State Ave).pdf (1.4 MB) (pdf)
-
Idaho (W 8th St to Meridian).pdf (4.7 MB) (pdf)
-
Maple (1st to Meridian).pdf (2.4 MB) (pdf)
-
W 2nd St (Camellia to Cherry Ln).pdf (2.64 MB) (pdf)
-
W 3rd St (Pine to End).pdf (1.92 MB) (pdf)
-
W 4th St (Broadway Ave to Maple Ave).pdf (6 MB) (pdf)
-
W 6th St (W Carlton to W Washington).pdf (2.68 MB) (pdf)
-
Washington (7th to Carlton)_7th (Washington to N).pdf (9.8 MB) (pdf)
-
-
Winter 2022 Public Outreach
-
Winter 2022 Project Information and Project Designs
-
2nd St, Camellia Ave to Cherry Ln Design (1.73 MB) (pdf)
-
3rd St, Pine Ave to End Design (1.18 MB) (pdf)
-
4th St, Broadway Ave to Washington St Design (3.54 MB) (pdf)
-
Broadway Ave, 3rd St to 6th St Design (1.47 MB) (pdf)
-
Idaho Ave, 8th St to 3rd St Design (4.72 MB) (pdf)
-
Maple Ave, 1st St to Meridian Rd Design (1.83 MB) (pdf)
-
Cherry Ave, 4th St to 2nd St Design (3.33 MB) (pdf)
-
Related projects
Live Projects
Who's Listening
-
Construction Coordinator
Phone 208-387-6100 Email projects@achdidaho.org -
Business & Community Relations Coordinator
Phone 208-387-6100 Email ejohansen@achdidaho.org -
Project Manager
Phone 208-387-6100 Email connect@achdidaho.org