- Between Roosevelt and Kootenai - ped ramps complete.
- Signal turn on February 23rd.
- Roosevelt to Latah - Installing conduit under future sidewalk.
- Prepping for sidewalk.
- Between Roosevelt and Kootenai - ped ramps complete.
- Signal turn on February 23rd.
- Roosevelt to Latah - Installing conduit under future sidewalk.
- Prepping for sidewalk.
This project is substantially complete.
-
Share February 10, 2023 on Facebook
Share February 10, 2023 on X (formerly Twitter)
Share February 10, 2023 on Linkedin
Email February 10, 2023 link
- Between Roosevelt and Kootenai ped ramps are being placed.
- Base being placed in preparation of concrete.
- Roosevelt and Latah - installing conduit under future sidewalk.
- Prepping for sidewalk.
- Between Roosevelt and Kootenai ped ramps are being placed.
- Base being placed in preparation of concrete.
- Roosevelt and Latah - installing conduit under future sidewalk.
- Prepping for sidewalk.
This project is substantially complete.
-
Share February 3, 2023 on Facebook
Share February 3, 2023 on X (formerly Twitter)
Share February 3, 2023 on Linkedin
Email February 3, 2023 link
- Sidewalk being placed between Overland and Pond - ongoing.
- Between Roosevelt and Kootenai - placing pedestrian ramps anticipated February 3rd. Base being placed in preparation of concrete.
- Roosevelt and Latah - Installing conduit under future sidewalk.
Interested in reviewing aerial footage of this project? Click here.
- Sidewalk being placed between Overland and Pond - ongoing.
- Between Roosevelt and Kootenai - placing pedestrian ramps anticipated February 3rd. Base being placed in preparation of concrete.
- Roosevelt and Latah - Installing conduit under future sidewalk.
Interested in reviewing aerial footage of this project? Click here.
This project is substantially complete.
-
Share January 27, 2023 on Facebook
Share January 27, 2023 on X (formerly Twitter)
Share January 27, 2023 on Linkedin
Email January 27, 2023 link
- Sidewalk being placed on Overland and Pond - ongoing.
- Between Roosevelt and Kootenai - waiting on pedestrian ramps at Roosevelt. Base being placed in preparation of concrete.
- Shoshone intersection started January 18th. Installing storm drains at the intersection - ongoing.
- Sidewalk being placed on Overland and Pond - ongoing.
- Between Roosevelt and Kootenai - waiting on pedestrian ramps at Roosevelt. Base being placed in preparation of concrete.
- Shoshone intersection started January 18th. Installing storm drains at the intersection - ongoing.
This project is substantially complete.
-
Share January 20, 2023 on Facebook
Share January 20, 2023 on X (formerly Twitter)
Share January 20, 2023 on Linkedin
Email January 20, 2023 link
- Sidewalk being placed between Overland and Pond ongoing.
- New signal poles being installed at Roosevelt and Kootenai - complete.
- Waiting on pedestrian ramps at Roosevelt - anticipated to be complete January 25th.
- Shoshone intersection started January 18th. Installing the storm drain at the intersection.
- Sidewalk being placed between Overland and Pond ongoing.
- New signal poles being installed at Roosevelt and Kootenai - complete.
- Waiting on pedestrian ramps at Roosevelt - anticipated to be complete January 25th.
- Shoshone intersection started January 18th. Installing the storm drain at the intersection.
This project is substantially complete.
-
Share January 13, 2023 on Facebook
Share January 13, 2023 on X (formerly Twitter)
Share January 13, 2023 on Linkedin
Email January 13, 2023 link
- Sidewalk being placed between Overland and Pond - ongoing.
- New signal poles being installed at Roosevelt and Kootenai - complete. Waiting on pedestrian ramps at Roosevelt.
- Owyhee storm drain ongoing.
- Shoshone intersection starting January 18th - dependent on Owyhee finishing prior to the 18th.
- Sidewalk being placed between Overland and Pond - ongoing.
- New signal poles being installed at Roosevelt and Kootenai - complete. Waiting on pedestrian ramps at Roosevelt.
- Owyhee storm drain ongoing.
- Shoshone intersection starting January 18th - dependent on Owyhee finishing prior to the 18th.
This project is substantially complete.
-
Share January 6, 2023 on Facebook
Share January 6, 2023 on X (formerly Twitter)
Share January 6, 2023 on Linkedin
Email January 6, 2023 link
- Sidewalk being placed between Overland and Pond ongoing.
- New signal poles installed at Roosevelt and Kootenai is complete.
- Waiting on pedestrian ramps at Roosevelt.
- Owyhee storm drain ongoing.
- Sidewalk being placed between Overland and Pond ongoing.
- New signal poles installed at Roosevelt and Kootenai is complete.
- Waiting on pedestrian ramps at Roosevelt.
- Owyhee storm drain ongoing.
This project is substantially complete.
-
Share December 22, 2022 on Facebook
Share December 22, 2022 on X (formerly Twitter)
Share December 22, 2022 on Linkedin
Email December 22, 2022 link
- Sidewalk being placed between Overland and Pond.
- New signal poles being installed at Roosevelt and Kootenai.
- Waiting for Idaho Power to energize poles.
- Contractor working on the storm drain.
- Owyhee storm drain anticipated starting December 27th.
- Sidewalk being placed between Overland and Pond.
- New signal poles being installed at Roosevelt and Kootenai.
- Waiting for Idaho Power to energize poles.
- Contractor working on the storm drain.
- Owyhee storm drain anticipated starting December 27th.
This project is substantially complete.
-
Share December 16, 2022 on Facebook
Share December 16, 2022 on X (formerly Twitter)
Share December 16, 2022 on Linkedin
Email December 16, 2022 link
- Sidewalk being placed between Overland and Pond.
- New signal poles being installed at Roosevelt and Kootenai. Complete - waiting on Idaho Power to energize poles.
- Contractor moving to Latah for signal pole and storm drain.
- Sidewalk being placed between Overland and Pond.
- New signal poles being installed at Roosevelt and Kootenai. Complete - waiting on Idaho Power to energize poles.
- Contractor moving to Latah for signal pole and storm drain.
This project is substantially complete.
-
Share December 9, 2022 on Facebook
Share December 9, 2022 on X (formerly Twitter)
Share December 9, 2022 on Linkedin
Email December 9, 2022 link
- Sidewalk being placed between Overland and Pond.
- New signal poles being installed at Roosevelt and Kootenai.
- Storm drain starting between Vista and Shoshone ongoing.
- Sidewalk being placed between Overland and Pond.
- New signal poles being installed at Roosevelt and Kootenai.
- Storm drain starting between Vista and Shoshone ongoing.
This project is substantially complete.