Munger Road Bridges

Share Munger Road Bridges on Facebook Share Munger Road Bridges on Twitter Share Munger Road Bridges on Linkedin Email Munger Road Bridges link

As part of the Ada County Highway District’s (ACHD) Bridge Maintenance Program, ACHD will replace the culverts on Munger Road, south of New Hope Road, starting as early as mid-December.* Construction is expected to be complete in summer 2026.

Project Highlights

  • Removing and replacing the existing bridges on Munger Road
  • Reconstructing the roadway
  • Filling in the sidewalk gap on the east side of Munger Road, between W. Shortcreek Street and N. Catamaran Way, including new curb, gutter, and pedestrian ramps
  • Improving stormwater facilities to enhance drainage

Construction Impacts

  • Munger Road will be closed during construction
  • Pedestrian detours and sidewalk closures
  • Lane restrictions with flaggers
  • Neighborhood traffic calming will be in place to discourage cut-through traffic on residential streets
  • General construction noise, dust, equipment backup alarms and ground vibration
  • Crews will work from 7 a.m. to 7 p.m. unless otherwise approved
  • The contractor will work with property owners to minimize impacts

As part of the Ada County Highway District’s (ACHD) Bridge Maintenance Program, ACHD will replace the culverts on Munger Road, south of New Hope Road, starting as early as mid-December.* Construction is expected to be complete in summer 2026.

Project Highlights

  • Removing and replacing the existing bridges on Munger Road
  • Reconstructing the roadway
  • Filling in the sidewalk gap on the east side of Munger Road, between W. Shortcreek Street and N. Catamaran Way, including new curb, gutter, and pedestrian ramps
  • Improving stormwater facilities to enhance drainage

Construction Impacts

  • Munger Road will be closed during construction
  • Pedestrian detours and sidewalk closures
  • Lane restrictions with flaggers
  • Neighborhood traffic calming will be in place to discourage cut-through traffic on residential streets
  • General construction noise, dust, equipment backup alarms and ground vibration
  • Crews will work from 7 a.m. to 7 p.m. unless otherwise approved
  • The contractor will work with property owners to minimize impacts
  • December 11, 2025

    Share December 11, 2025 on Facebook Share December 11, 2025 on Twitter Share December 11, 2025 on Linkedin Email December 11, 2025 link
    • Speed bumps installed in the adjacent neighborhoods.
Page last updated: 11 Dec 2025, 03:50 PM