2025 Meridian Downtown Pavement and Pedestrian Improvements
This Project is substantially complete
The Ada County Highway District (ACHD) will be repaving or reconstructing several streets in Meridian as part of a locally funded project to improve pavement conditions and upgrade the streets for all users.
Work could include
- Filling in sidewalk gaps and replacing deteriorated sidewalk to improve connectivity
- Adding bulb-outs and narrowing travel lanes where appropriate to improve safety
- Upgrading and/or installing pedestrian ramps to meet modern standards and the Americans with Disabilities Act (ADA)
- Adding crosswalk markings for school walk route crossings
- Stormwater and irrigation upgrades to improve flows
Street Segments
- Broadway Avenue, East 3rd Street to East 6th Street
- Cherry Avenue, West 4th Street to Meridian Road
- East 2nd Street, Idaho Avenue to Pine Avenue
- East 4th Street, Broadway Avenue to State Avenue
- Idaho Avenue, West 8th Street to Meridian Road
- Maple Avenue, West 1st Street to Meridian Road
- West 2nd Street, Cherry Avenue to Cherry Lane
- West 3rd Street, Pine Street to North End
- West 4th Street, Broadway Avenue to North of Maple Avenue
- West 5th Street, Carlton Avenue to Washington Street
- West 6th Street, Carlton Avenue to Washington Street
- West 7th Street, Washington Street to the pathway South of McFadden Avenue
- Washington Street, West 7th Street to Meridian Road
To arrange for a translator or other accommodation, contact ACHD at (208) 387-6100 | TTY 1-800-377-3529 | projects@achdidaho.org.
Se les recomienda a las personas que necesiten un intérprete o arreglos especiales que llamen a la coordinadora de participación pública, al (208) 387-6100 | TTY 1-800-377-3529 | projects@achdidaho.org
The Ada County Highway District (ACHD) will be repaving or reconstructing several streets in Meridian as part of a locally funded project to improve pavement conditions and upgrade the streets for all users.
Work could include
- Filling in sidewalk gaps and replacing deteriorated sidewalk to improve connectivity
- Adding bulb-outs and narrowing travel lanes where appropriate to improve safety
- Upgrading and/or installing pedestrian ramps to meet modern standards and the Americans with Disabilities Act (ADA)
- Adding crosswalk markings for school walk route crossings
- Stormwater and irrigation upgrades to improve flows
Street Segments
- Broadway Avenue, East 3rd Street to East 6th Street
- Cherry Avenue, West 4th Street to Meridian Road
- East 2nd Street, Idaho Avenue to Pine Avenue
- East 4th Street, Broadway Avenue to State Avenue
- Idaho Avenue, West 8th Street to Meridian Road
- Maple Avenue, West 1st Street to Meridian Road
- West 2nd Street, Cherry Avenue to Cherry Lane
- West 3rd Street, Pine Street to North End
- West 4th Street, Broadway Avenue to North of Maple Avenue
- West 5th Street, Carlton Avenue to Washington Street
- West 6th Street, Carlton Avenue to Washington Street
- West 7th Street, Washington Street to the pathway South of McFadden Avenue
- Washington Street, West 7th Street to Meridian Road
To arrange for a translator or other accommodation, contact ACHD at (208) 387-6100 | TTY 1-800-377-3529 | projects@achdidaho.org.
Se les recomienda a las personas que necesiten un intérprete o arreglos especiales que llamen a la coordinadora de participación pública, al (208) 387-6100 | TTY 1-800-377-3529 | projects@achdidaho.org
This Project is substantially complete
-
November 20, 2025
Share November 20, 2025 on Facebook Share November 20, 2025 on Twitter Share November 20, 2025 on Linkedin Email November 20, 2025 link- Minor punch list items remain.
- Minor punch list items remain.
This Project is substantially complete
-
November 14, 2025
Share November 14, 2025 on Facebook Share November 14, 2025 on Twitter Share November 14, 2025 on Linkedin Email November 14, 2025 linkProject includes work on the following segments:
- Broadway Ave, E 3rd Street to E 6th Street - COMPLETE
- Cherry Ave, NW 4th Street to Meridian Rd - COMPLETE
- Idaho Ave, W 8th St to Meridian Rd - Minor concrete and landscape items remain. Projected completion date 11/26.
- Maple Ave, W 1st Street to Meridian Rd - COMPLETE
- Washington St, NW 7th Street to Meridian Rd - COMPLETE
- E 2nd Street, Idaho Ave to Pine Ave - COMPLETE
- E 4th Street, Broadway Ave to State Ave - COMPLETE
- W 2nd Street, Cherry Ave to Cherry Lane - Sidewalk and landscaping remain.
- W 3rd Street, Pine Ave to north end - COMPLETE
- NW 4th Street, Broadway Ave to Maple Ave - COMPLETE
- NW 6th Street, Carlton Ave to Washington St - COMPLETE
- NW 7th Street, McFadden Ave to Washington St - COMPLETE
Project includes work on the following segments:
- Broadway Ave, E 3rd Street to E 6th Street - COMPLETE
- Cherry Ave, NW 4th Street to Meridian Rd - COMPLETE
- Idaho Ave, W 8th St to Meridian Rd - Minor concrete and landscape items remain. Projected completion date 11/26.
- Maple Ave, W 1st Street to Meridian Rd - COMPLETE
- Washington St, NW 7th Street to Meridian Rd - COMPLETE
- E 2nd Street, Idaho Ave to Pine Ave - COMPLETE
- E 4th Street, Broadway Ave to State Ave - COMPLETE
- W 2nd Street, Cherry Ave to Cherry Lane - Sidewalk and landscaping remain.
- W 3rd Street, Pine Ave to north end - COMPLETE
- NW 4th Street, Broadway Ave to Maple Ave - COMPLETE
- NW 6th Street, Carlton Ave to Washington St - COMPLETE
- NW 7th Street, McFadden Ave to Washington St - COMPLETE
This Project is substantially complete
-
November 7, 2025
Share November 7, 2025 on Facebook Share November 7, 2025 on Twitter Share November 7, 2025 on Linkedin Email November 7, 2025 linkProject includes work on the following segments:
- Broadway Ave, E 3rd Street to E 6th Street - COMPLETE
- Cherry Ave, NW 4th Street to Meridian Rd - COMPLETE
- Idaho Ave, W 8th St to Meridian Rd - Minor concrete and landscape items remain.
- Maple Ave, W 1st Street to Meridian Rd - COMPLETE
- Washington St, NW 7th Street to Meridian Rd - COMPLETE
- E 2nd Street, Idaho Ave to Pine Ave - COMPLETE
- E 4th Street, Broadway Ave to State Ave - COMPLETE
- W 2nd Street, Cherry Ave to Cherry Lane - Sidewalk and landscaping remain.
- W 3rd Street, Pine Ave to north end - COMPLETE
- NW 4th Street, Broadway Ave to Maple Ave - COMPLETE
- NW 6th Street, Carlton Ave to Washington St - COMPLETE
- NW 7th Street, McFadden Ave to Washington St - COMPLETE
Project includes work on the following segments:
- Broadway Ave, E 3rd Street to E 6th Street - COMPLETE
- Cherry Ave, NW 4th Street to Meridian Rd - COMPLETE
- Idaho Ave, W 8th St to Meridian Rd - Minor concrete and landscape items remain.
- Maple Ave, W 1st Street to Meridian Rd - COMPLETE
- Washington St, NW 7th Street to Meridian Rd - COMPLETE
- E 2nd Street, Idaho Ave to Pine Ave - COMPLETE
- E 4th Street, Broadway Ave to State Ave - COMPLETE
- W 2nd Street, Cherry Ave to Cherry Lane - Sidewalk and landscaping remain.
- W 3rd Street, Pine Ave to north end - COMPLETE
- NW 4th Street, Broadway Ave to Maple Ave - COMPLETE
- NW 6th Street, Carlton Ave to Washington St - COMPLETE
- NW 7th Street, McFadden Ave to Washington St - COMPLETE
This Project is substantially complete
-
October 31, 2025
Share October 31, 2025 on Facebook Share October 31, 2025 on Twitter Share October 31, 2025 on Linkedin Email October 31, 2025 link- Broadway Ave, E 3rd Street to E 6th Street - Complete
- Cherry Ave, NW 4th Street to Meridian Rd - Complete
- Idaho Ave, W 8th St to Meridian Rd -
- Broadway Ave, E 3rd Street to E 6th Street - Complete
- Cherry Ave, NW 4th Street to Meridian Rd - Complete
- Idaho Ave, W 8th St to Meridian Rd - Paving complete from 3rd west. Sidewalk, curb and gutter ongoing to the east. Next pave date is scheduled for Oct 30 and 31. Landscaping and sidewalk work ongoing.
- Maple Ave, W 1st Street to Meridian Rd - Complete
- Washington St, NW 7th Street to Meridian Rd - Complete
- E 2nd Street, Idaho Ave to Pine Ave - Complete
- E 4th Street, Broadway Ave to State Ave - Complete
- W 2nd Street, Cherry Ave to Cherry Lane - Sidewalk and landscaping remain.
- W 3rd Street, Pine Ave to north end - Complete
- NW 4th Street, Broadway Ave to Maple Ave - Complete
- NW 6th Street, Carlton Ave to Washington St - Complete
- NW 7th Street, McFadden Ave to Washington St - Complete
- Maple Ave, W 1st Street to Meridian Rd - Complete
- Washington St, NW 7th Street to Meridian Rd - Complete
- E 2nd Street, Idaho Ave to Pine Ave - Complete
- E 4th Street, Broadway Ave to State Ave - Complete
- W 2nd Street, Cherry Ave to Cherry Lane - Sidewalk and landscaping remain.
- W 3rd Street, Pine Ave to north end - Complete
- NW 4th Street, Broadway Ave to Maple Ave - Complete
- NW 6th Street, Carlton Ave to Washington St - Complete
- NW 7th Street, McFadden Ave to Washington St - Complete
- Broadway Ave, E 3rd Street to E 6th Street - Complete
- Cherry Ave, NW 4th Street to Meridian Rd - Complete
- Idaho Ave, W 8th St to Meridian Rd -
- Broadway Ave, E 3rd Street to E 6th Street - Complete
- Cherry Ave, NW 4th Street to Meridian Rd - Complete
- Idaho Ave, W 8th St to Meridian Rd - Paving complete from 3rd west. Sidewalk, curb and gutter ongoing to the east. Next pave date is scheduled for Oct 30 and 31. Landscaping and sidewalk work ongoing.
- Maple Ave, W 1st Street to Meridian Rd - Complete
- Washington St, NW 7th Street to Meridian Rd - Complete
- E 2nd Street, Idaho Ave to Pine Ave - Complete
- E 4th Street, Broadway Ave to State Ave - Complete
- W 2nd Street, Cherry Ave to Cherry Lane - Sidewalk and landscaping remain.
- W 3rd Street, Pine Ave to north end - Complete
- NW 4th Street, Broadway Ave to Maple Ave - Complete
- NW 6th Street, Carlton Ave to Washington St - Complete
- NW 7th Street, McFadden Ave to Washington St - Complete
- Maple Ave, W 1st Street to Meridian Rd - Complete
- Washington St, NW 7th Street to Meridian Rd - Complete
- E 2nd Street, Idaho Ave to Pine Ave - Complete
- E 4th Street, Broadway Ave to State Ave - Complete
- W 2nd Street, Cherry Ave to Cherry Lane - Sidewalk and landscaping remain.
- W 3rd Street, Pine Ave to north end - Complete
- NW 4th Street, Broadway Ave to Maple Ave - Complete
- NW 6th Street, Carlton Ave to Washington St - Complete
- NW 7th Street, McFadden Ave to Washington St - Complete
This Project is substantially complete
-
October 24, 2025
Share October 24, 2025 on Facebook Share October 24, 2025 on Twitter Share October 24, 2025 on Linkedin Email October 24, 2025 link- Broadway Ave, E 3rd Street to E 6th Street - Complete
- Cherry Ave, NW 4th Street to Meridian Rd - Complete
- Idaho Ave, W 8th St to Meridian Rd - Paving complete from 3rd west. Sidewalk, curb and gutter ongoing to the east. Next pave date is scheduled for Oct 30 and 31. Landscaping and sidewalk work ongoing.
- Maple Ave, W 1st Street to Meridian Rd - Complete
- Washington St, NW 7th Street to Meridian Rd - Complete
- E 2nd Street, Idaho Ave to Pine Ave - Complete
- E 4th Street, Broadway Ave to State Ave - Complete
- W 2nd Street, Cherry Ave to Cherry Lane - Sidewalk and landscaping remain.
- W 3rd Street, Pine Ave to north end - Complete
- NW 4th Street, Broadway Ave to Maple Ave - Complete
- NW 6th Street, Carlton Ave to Washington St - Complete
- NW 7th Street, McFadden Ave to Washington St - Complete
- Broadway Ave, E 3rd Street to E 6th Street - Complete
- Cherry Ave, NW 4th Street to Meridian Rd - Complete
- Idaho Ave, W 8th St to Meridian Rd - Paving complete from 3rd west. Sidewalk, curb and gutter ongoing to the east. Next pave date is scheduled for Oct 30 and 31. Landscaping and sidewalk work ongoing.
- Maple Ave, W 1st Street to Meridian Rd - Complete
- Washington St, NW 7th Street to Meridian Rd - Complete
- E 2nd Street, Idaho Ave to Pine Ave - Complete
- E 4th Street, Broadway Ave to State Ave - Complete
- W 2nd Street, Cherry Ave to Cherry Lane - Sidewalk and landscaping remain.
- W 3rd Street, Pine Ave to north end - Complete
- NW 4th Street, Broadway Ave to Maple Ave - Complete
- NW 6th Street, Carlton Ave to Washington St - Complete
- NW 7th Street, McFadden Ave to Washington St - Complete
This Project is substantially complete
-
October 17, 2025
Share October 17, 2025 on Facebook Share October 17, 2025 on Twitter Share October 17, 2025 on Linkedin Email October 17, 2025 link- Broadway Ave, E 3rd Street to E 6th Street - Complete
- Cherry Ave, NW 4th Street to Meridian Rd - Complete
- Idaho Ave, W 8th St to Meridian Rd - Paving complete from 3rd west. Sidewalk, curb and gutter ongoing to the east. Next pave date is scheduled for Oct 30 and 31. Landscaping and sidewalk work ongoing.
- Maple Ave, W 1st Street to Meridian Rd - Complete
- Washington St, NW 7th Street to Meridian Rd - Complete
- E 2nd Street, Idaho Ave to Pine Ave - Complete
- E 4th Street, Broadway Ave to State Ave - Complete
- W 2nd Street, Cherry Ave to Cherry Lane - Sidewalk and landscaping remain.
- W 3rd Street, Pine Ave to north end - Complete
- NW 4th Street, Broadway Ave to Maple Ave - Complete
- NW 6th Street, Carlton Ave to Washington St - Complete
- NW 7th Street, McFadden Ave to Washington St - Complete
- Broadway Ave, E 3rd Street to E 6th Street - Complete
- Cherry Ave, NW 4th Street to Meridian Rd - Complete
- Idaho Ave, W 8th St to Meridian Rd - Paving complete from 3rd west. Sidewalk, curb and gutter ongoing to the east. Next pave date is scheduled for Oct 30 and 31. Landscaping and sidewalk work ongoing.
- Maple Ave, W 1st Street to Meridian Rd - Complete
- Washington St, NW 7th Street to Meridian Rd - Complete
- E 2nd Street, Idaho Ave to Pine Ave - Complete
- E 4th Street, Broadway Ave to State Ave - Complete
- W 2nd Street, Cherry Ave to Cherry Lane - Sidewalk and landscaping remain.
- W 3rd Street, Pine Ave to north end - Complete
- NW 4th Street, Broadway Ave to Maple Ave - Complete
- NW 6th Street, Carlton Ave to Washington St - Complete
- NW 7th Street, McFadden Ave to Washington St - Complete
This Project is substantially complete
-
October 10, 2025
Share October 10, 2025 on Facebook Share October 10, 2025 on Twitter Share October 10, 2025 on Linkedin Email October 10, 2025 link- Broadway Ave, E 3rd Street to E 6th Street - Complete
- Cherry Ave, NW 4th Street to Meridian Rd - Complete
- Idaho Ave, W 8th St to Meridian Rd - Paving complete from 3rd west. Sidewalk, curb and gutter ongoing to the east. Next pave date is scheduled for Oct 15 and 16. Landscaping and sidewalk work ongoing.
- Maple Ave, W 1st Street to Meridian Rd - Complete
- Washington St, NW 7th Street to Meridian Rd - Complete
- E 2nd Street, Idaho Ave to Pine Ave - Complete
- E 4th Street, Broadway Ave to State Ave - Complete
- W 2nd Street, Cherry Ave to Cherry Lane - Paved on September 30th. Landscape repair ongoing.
- W 3rd Street, Pine Ave to north end - Complete
- NW 4th Street, Broadway Ave to Maple Ave - Complete
- NW 6th Street, Carlton Ave to Washington St - Complete
- NW 7th Street, McFadden Ave to Washington St - Complete
- Broadway Ave, E 3rd Street to E 6th Street - Complete
- Cherry Ave, NW 4th Street to Meridian Rd - Complete
- Idaho Ave, W 8th St to Meridian Rd - Paving complete from 3rd west. Sidewalk, curb and gutter ongoing to the east. Next pave date is scheduled for Oct 15 and 16. Landscaping and sidewalk work ongoing.
- Maple Ave, W 1st Street to Meridian Rd - Complete
- Washington St, NW 7th Street to Meridian Rd - Complete
- E 2nd Street, Idaho Ave to Pine Ave - Complete
- E 4th Street, Broadway Ave to State Ave - Complete
- W 2nd Street, Cherry Ave to Cherry Lane - Paved on September 30th. Landscape repair ongoing.
- W 3rd Street, Pine Ave to north end - Complete
- NW 4th Street, Broadway Ave to Maple Ave - Complete
- NW 6th Street, Carlton Ave to Washington St - Complete
- NW 7th Street, McFadden Ave to Washington St - Complete
This Project is substantially complete
-
October 2, 2025
Share October 2, 2025 on Facebook Share October 2, 2025 on Twitter Share October 2, 2025 on Linkedin Email October 2, 2025 link- Broadway Ave, E 3rd Street to E 6th Street - Complete
- Cherry Ave, NW 4th Street to Meridian Rd - Complete
- Idaho Ave, W 8th St to Meridian Rd - Paving the west end the week of October 13th. Sidewalk, curb and gutter ongoing to the east.
- Maple Ave, W 1st Street to Meridian Rd - Complete
- Washington St, NW 7th Street to Meridian Rd - Complete
- E 2nd Street, Idaho Ave to Pine Ave - Complete
- E 4th Street, Broadway Ave to State Ave - Complete
- W 2nd Street, Cherry Ave to Cherry Lane - Paved on September 30th. Landscape repair ongoing.
- W 3rd Street, Pine Ave to north end - Complete
- NW 4th Street, Broadway Ave to Maple Ave - Complete
- NW 6th Street, Carlton Ave to Washington St - Complete
- NW 7th Street, McFadden Ave to Washington St - Complete
- Broadway Ave, E 3rd Street to E 6th Street - Complete
- Cherry Ave, NW 4th Street to Meridian Rd - Complete
- Idaho Ave, W 8th St to Meridian Rd - Paving the west end the week of October 13th. Sidewalk, curb and gutter ongoing to the east.
- Maple Ave, W 1st Street to Meridian Rd - Complete
- Washington St, NW 7th Street to Meridian Rd - Complete
- E 2nd Street, Idaho Ave to Pine Ave - Complete
- E 4th Street, Broadway Ave to State Ave - Complete
- W 2nd Street, Cherry Ave to Cherry Lane - Paved on September 30th. Landscape repair ongoing.
- W 3rd Street, Pine Ave to north end - Complete
- NW 4th Street, Broadway Ave to Maple Ave - Complete
- NW 6th Street, Carlton Ave to Washington St - Complete
- NW 7th Street, McFadden Ave to Washington St - Complete
This Project is substantially complete
-
September 26, 2025
Share September 26, 2025 on Facebook Share September 26, 2025 on Twitter Share September 26, 2025 on Linkedin Email September 26, 2025 link- Broadway Ave, E 3rd Street to E 6th Street - Complete
- Cherry Ave, NW 4th Street to Meridian Rd - Complete
- Idaho Ave, W 8th St to Meridian Rd - Paving the west end on September 17th. Sidewalk, curb and gutter ongoing to the east.
- Maple Ave, W 1st Street to Meridian Rd - Complete
- Washington St, NW 7th Street to Meridian Rd
- E 2nd Street, Idaho Ave to Pine Ave - Complete
- E 4th Street, Broadway Ave to State Ave - Complete
- W 2nd Street, Cherry Ave to Cherry Lane - Grade prep and curb and gutter install ongoing. Sidewalk curb and gutter install ongoing.
- W 3rd Street, Pine Ave to north end - Complete
- NW 4th Street, Broadway Ave to Maple Ave - Complete
- NW 6th Street, Carlton Ave to Washington St - Complete
- NW 7th Street, McFadden Ave to Washington St - Complete
- Broadway Ave, E 3rd Street to E 6th Street - Complete
- Cherry Ave, NW 4th Street to Meridian Rd - Complete
- Idaho Ave, W 8th St to Meridian Rd - Paving the west end on September 17th. Sidewalk, curb and gutter ongoing to the east.
- Maple Ave, W 1st Street to Meridian Rd - Complete
- Washington St, NW 7th Street to Meridian Rd
- E 2nd Street, Idaho Ave to Pine Ave - Complete
- E 4th Street, Broadway Ave to State Ave - Complete
- W 2nd Street, Cherry Ave to Cherry Lane - Grade prep and curb and gutter install ongoing. Sidewalk curb and gutter install ongoing.
- W 3rd Street, Pine Ave to north end - Complete
- NW 4th Street, Broadway Ave to Maple Ave - Complete
- NW 6th Street, Carlton Ave to Washington St - Complete
- NW 7th Street, McFadden Ave to Washington St - Complete
This Project is substantially complete
-
September 19, 2025
Share September 19, 2025 on Facebook Share September 19, 2025 on Twitter Share September 19, 2025 on Linkedin Email September 19, 2025 link- Broadway Ave, E 3rd Street to E 6th Street - COMPLETE
- Cherry Ave, NW 4th Street to Meridian Rd - COMPLETE
- Idaho Ave, W 8th St to Meridian Rd - Paving the west end on September 17th. Sidewalk, curb and gutter ongoing to the east.
- Maple Ave, W 1st Street to Meridian Rd - COMPLETE
- Washington St, NW 7th Street to Meridian Rd - COMPLETE
- E 2nd Street, Idaho Ave to Pine Ave - COMPLETE
- E 4th Street, Broadway Ave to State Ave - COMPLETE
- W 2nd Street, Cherry Ave to Cherry Lane - Grade prep and curb and gutter install ongoing. Sidewalk curb and gutter install ongoing.
- W 3rd Street, Pine Ave to north end - COMPLETE
- NW 4th Street, Broadway Ave to Maple Ave - COMPLETE
- NW 6th Street, Carlton Ave to Washington St - COMPLETE
- NW 7th Street, McFadden Ave to Washington St - COMPLETE
- Broadway Ave, E 3rd Street to E 6th Street - COMPLETE
- Cherry Ave, NW 4th Street to Meridian Rd - COMPLETE
- Idaho Ave, W 8th St to Meridian Rd - Paving the west end on September 17th. Sidewalk, curb and gutter ongoing to the east.
- Maple Ave, W 1st Street to Meridian Rd - COMPLETE
- Washington St, NW 7th Street to Meridian Rd - COMPLETE
- E 2nd Street, Idaho Ave to Pine Ave - COMPLETE
- E 4th Street, Broadway Ave to State Ave - COMPLETE
- W 2nd Street, Cherry Ave to Cherry Lane - Grade prep and curb and gutter install ongoing. Sidewalk curb and gutter install ongoing.
- W 3rd Street, Pine Ave to north end - COMPLETE
- NW 4th Street, Broadway Ave to Maple Ave - COMPLETE
- NW 6th Street, Carlton Ave to Washington St - COMPLETE
- NW 7th Street, McFadden Ave to Washington St - COMPLETE
This Project is substantially complete
Documents
-
Winter 2024 Update
-
Broadway (E 3rd St to E 6th St).pdf (2.48 MB) (pdf)
-
Cherry (W 4th to Meridian).pdf (4.69 MB) (pdf)
-
E 2nd St (Idaho Ave to Pine Ave).pdf (2.68 MB) (pdf)
-
E 4th Street (Broadway Ave to State Ave).pdf (1.4 MB) (pdf)
-
Idaho (W 8th St to Meridian).pdf (4.7 MB) (pdf)
-
Maple (1st to Meridian).pdf (2.4 MB) (pdf)
-
W 2nd St (Camellia to Cherry Ln).pdf (2.64 MB) (pdf)
-
W 3rd St (Pine to End).pdf (1.92 MB) (pdf)
-
W 4th St (Broadway Ave to Maple Ave).pdf (6 MB) (pdf)
-
W 6th St (W Carlton to W Washington).pdf (2.68 MB) (pdf)
-
Washington (7th to Carlton)_7th (Washington to N).pdf (9.8 MB) (pdf)
-
-
Winter 2022 Public Outreach
-
Winter 2022 Project Information and Project Designs
-
2nd St, Camellia Ave to Cherry Ln Design (1.73 MB) (pdf)
-
3rd St, Pine Ave to End Design (1.18 MB) (pdf)
-
4th St, Broadway Ave to Washington St Design (3.54 MB) (pdf)
-
Broadway Ave, 3rd St to 6th St Design (1.47 MB) (pdf)
-
Idaho Ave, 8th St to 3rd St Design (4.72 MB) (pdf)
-
Maple Ave, 1st St to Meridian Rd Design (1.83 MB) (pdf)
-
Cherry Ave, 4th St to 2nd St Design (3.33 MB) (pdf)
-
Related projects
Live Projects
Who's Listening
-
Construction Coordinator
Phone 208-387-6100 Email projects@achdidaho.org -
Business & Community Relations Coordinator
Phone 208-387-6100 Email ejohansen@achdidaho.org -
Project Manager
Phone 208-387-6100 Email connect@achdidaho.org