Share October 12, 2023 on Facebook
Share October 12, 2023 on X (formerly Twitter)
Share October 12, 2023 on Linkedin
Email October 12, 2023 link
This project is substantially complete
This project is substantially complete
This project is substantially complete
-
Share July 7, 2023 on Facebook
Share July 7, 2023 on X (formerly Twitter)
Share July 7, 2023 on Linkedin
Email July 7, 2023 link
- Fence installation around the basin continues.
- Roadway open to traffic. Minor concrete repairs are needed prior to pedestrian access.
- Basin dirt work on-going - seeding will be in the fall.
- Fence installation around the basin continues.
- Roadway open to traffic. Minor concrete repairs are needed prior to pedestrian access.
- Basin dirt work on-going - seeding will be in the fall.
This project is substantially complete
-
Share June 30, 2023 on Facebook
Share June 30, 2023 on X (formerly Twitter)
Share June 30, 2023 on Linkedin
Email June 30, 2023 link
- Paving complete.
- Water line tie-in complete for the basin.
- Fence installation around the basin continues.
- Roadway open to traffic. Minor concrete repairs needed prior to pedestrian access.
- Basin dirt work ongoing - seeding will be in the fall.
- Paving complete.
- Water line tie-in complete for the basin.
- Fence installation around the basin continues.
- Roadway open to traffic. Minor concrete repairs needed prior to pedestrian access.
- Basin dirt work ongoing - seeding will be in the fall.
This project is substantially complete
-
Share June 23, 2023 on Facebook
Share June 23, 2023 on X (formerly Twitter)
Share June 23, 2023 on Linkedin
Email June 23, 2023 link
- Contractor scheduled to pave June 23rd.
- Water line tie-in complete for the basin.
- Minor grading work continues on the basin. Topsoil needed.
- Fence install around the basin started.
- Contractor scheduled to pave June 23rd.
- Water line tie-in complete for the basin.
- Minor grading work continues on the basin. Topsoil needed.
- Fence install around the basin started.
This project is substantially complete
-
Share June 16, 2023 on Facebook
Share June 16, 2023 on X (formerly Twitter)
Share June 16, 2023 on Linkedin
Email June 16, 2023 link
- Contractor continues to prep sub base for road.
- Work continues on curb, gutter and sidewalk.
- The contractor anticipates paving after the water hot tap. Likely middle/end of June.
- Minor grading work continues on the basin. Top soil needed.
- Contractor continues to prep sub base for road.
- Work continues on curb, gutter and sidewalk.
- The contractor anticipates paving after the water hot tap. Likely middle/end of June.
- Minor grading work continues on the basin. Top soil needed.
This project is substantially complete
-
Share June 2, 2023 on Facebook
Share June 2, 2023 on X (formerly Twitter)
Share June 2, 2023 on Linkedin
Email June 2, 2023 link
- Contractor continues to pre sub base for the road.
- Work continues on the curb, gutter and sidewalk.
- The contractor anticipates paving the first week of June.
- Minor grading work continues on the basin.
- Contractor continues to pre sub base for the road.
- Work continues on the curb, gutter and sidewalk.
- The contractor anticipates paving the first week of June.
- Minor grading work continues on the basin.
This project is substantially complete
-
Share May 26, 2023 on Facebook
Share May 26, 2023 on X (formerly Twitter)
Share May 26, 2023 on Linkedin
Email May 26, 2023 link
- Contractor continues to prep for sub-base for the road.
- Work continues on curb, gutter and sidewalk.
- The contractor anticipates paving the first week of June.
- Minor grading work continues on basin.
- Contractor continues to prep for sub-base for the road.
- Work continues on curb, gutter and sidewalk.
- The contractor anticipates paving the first week of June.
- Minor grading work continues on basin.
This project is substantially complete
-
Share May 19, 2023 on Facebook
Share May 19, 2023 on X (formerly Twitter)
Share May 19, 2023 on Linkedin
Email May 19, 2023 link
- Bridge is complete.
- Sidewalk and gutter ongoing.
- Placing base gravel in preparation for paving.
- Bridge is complete.
- Sidewalk and gutter ongoing.
- Placing base gravel in preparation for paving.
This project is substantially complete
-
Share May 12, 2023 on Facebook
Share May 12, 2023 on X (formerly Twitter)
Share May 12, 2023 on Linkedin
Email May 12, 2023 link
- Concrete cap installed.
- Sidewalk and gutter ongoing.
- Veolia water line complete.
- Placing base gravels.
- Concrete cap installed.
- Sidewalk and gutter ongoing.
- Veolia water line complete.
- Placing base gravels.
This project is substantially complete
-
Share May 5, 2023 on Facebook
Share May 5, 2023 on X (formerly Twitter)
Share May 5, 2023 on Linkedin
Email May 5, 2023 link
- Grade work for the basin is nearly complete
- Structure complete
- Grade work started May 1st
- Concrete cap installed
- Sidewalk and gutter ongoing
- Veolia water line ongoing
- Grade work for the basin is nearly complete
- Structure complete
- Grade work started May 1st
- Concrete cap installed
- Sidewalk and gutter ongoing
- Veolia water line ongoing
This project is substantially complete