Ustick Road, Ten Mile Road to Linder Road

Share Ustick Road, Ten Mile Road to Linder Road on Facebook Share Ustick Road, Ten Mile Road to Linder Road on Twitter Share Ustick Road, Ten Mile Road to Linder Road on Linkedin Email Ustick Road, Ten Mile Road to Linder Road link

The Ada County Highway District (ACHD) is widening Ustick Road, Ten Mile Road to Linder Road. The purpose of this project is to improve traffic flow and increase safety for all users. Work is expected to be complete in late 2026.*

Project Description

  • Widen Ustick Road, Ten Mile to Linder, to two travel lanes in each direction with a continuous center turn lane.
  • Raised medians will be located within the center lane in areas where they do not restrict access from public streets and/or driveways.
  • Construct a 10-foot, multi-use pathway on the north and south sides of Ustick Road.
  • Install a traffic signal at the intersection of Ustick Road and Towerbridge Way.
  • Construct a new pedestrian bridge crossing over Five Mile Creek to provide a connection with the multi-use pathway.
  • The multi-use pathway will transition to bike lanes and attached sidewalks at the Ustick Road and Ten Mile Road intersection.

Traffic and Construction Impacts

  • Road closures are expected during construction
  • Lane restrictions with flaggers
  • General construction noise, dust, equipment backup alarms and ground vibration
  • Crews will work from 7 a.m. to 7 p.m. unless otherwise approved
  • The contractor will work with property owners to minimize impacts and maintain access

*Construction schedules may change

The Ada County Highway District (ACHD) is widening Ustick Road, Ten Mile Road to Linder Road. The purpose of this project is to improve traffic flow and increase safety for all users. Work is expected to be complete in late 2026.*

Project Description

  • Widen Ustick Road, Ten Mile to Linder, to two travel lanes in each direction with a continuous center turn lane.
  • Raised medians will be located within the center lane in areas where they do not restrict access from public streets and/or driveways.
  • Construct a 10-foot, multi-use pathway on the north and south sides of Ustick Road.
  • Install a traffic signal at the intersection of Ustick Road and Towerbridge Way.
  • Construct a new pedestrian bridge crossing over Five Mile Creek to provide a connection with the multi-use pathway.
  • The multi-use pathway will transition to bike lanes and attached sidewalks at the Ustick Road and Ten Mile Road intersection.

Traffic and Construction Impacts

  • Road closures are expected during construction
  • Lane restrictions with flaggers
  • General construction noise, dust, equipment backup alarms and ground vibration
  • Crews will work from 7 a.m. to 7 p.m. unless otherwise approved
  • The contractor will work with property owners to minimize impacts and maintain access

*Construction schedules may change

  • Fall 2022 Public Outreach

    Share Fall 2022 Public Outreach on Facebook Share Fall 2022 Public Outreach on Twitter Share Fall 2022 Public Outreach on Linkedin Email Fall 2022 Public Outreach link

    This project's second round of public outreach closed on November 3, 2022. View the comment summary and infographic below!

  • Winter 2020 Public Outreach

    Share Winter 2020 Public Outreach on Facebook Share Winter 2020 Public Outreach on Twitter Share Winter 2020 Public Outreach on Linkedin Email Winter 2020 Public Outreach link

    In the winter of 2020, we asked neighbors to tell us about their experiences using Ustick Road from Ten Mile Road to Linder Road while driving, walking and/or bicycling, as well as what they thought our priorities should be as we develop the design. The survey closed January 7, 2021. View the public outreach comment summary below!

Page last updated: 30 Jan 2026, 10:23 AM