State Street, 8th Street to 4th Street

Share State Street, 8th Street to 4th Street on Facebook Share State Street, 8th Street to 4th Street on X (formerly Twitter) Share State Street, 8th Street to 4th Street on Linkedin Email State Street, 8th Street to 4th Street link

This project is substantially complete. 

  • Reconstruct State Street between 8th and 4th streets.
  • Upgrade all three traffic signals on this section of State St.
  • Construct bulb-outs for shorter pedestrian crossings and better visibility.
  • Add vegetated bioretention facilities for stormwater treatment.
  • Upgrade the existing enhanced crosswalk behind the Idaho State Capitol building to an overhead Rectangular Rapid Flashing Beacon.
  • Reconstruct State Street between 8th and 4th streets.
  • Upgrade all three traffic signals on this section of State St.
  • Construct bulb-outs for shorter pedestrian crossings and better visibility.
  • Add vegetated bioretention facilities for stormwater treatment.
  • Upgrade the existing enhanced crosswalk behind the Idaho State Capitol building to an overhead Rectangular Rapid Flashing Beacon.

This project is substantially complete. 

  • September 20, 2024

    Share September 20, 2024 on Facebook Share September 20, 2024 on X (formerly Twitter) Share September 20, 2024 on Linkedin Email September 20, 2024 link
    • 8th Street electrical/fiber work ongoing.
    • Idaho Power vault has been lowered.
    • Contractor has moved east and continues to prep road base from 6th to 8th.
    • Concrete paving complete between 4th and 5th St.
    • South side of 5th complete.
    • Power and fiber for signals nearly complete.
    • Sidewalks and ped ramp work ongoing between 4th and 5th.
    • Landscapers to follow.
    • 8th Street electrical/fiber work ongoing.
    • Idaho Power vault has been lowered.
    • Contractor has moved east and continues to prep road base from 6th to 8th.
    • Concrete paving complete between 4th and 5th St.
    • South side of 5th complete.
    • Power and fiber for signals nearly complete.
    • Sidewalks and ped ramp work ongoing between 4th and 5th.
    • Landscapers to follow.

    This project is substantially complete. 

  • September 13, 2024

    Share September 13, 2024 on Facebook Share September 13, 2024 on X (formerly Twitter) Share September 13, 2024 on Linkedin Email September 13, 2024 link
    • 8th Street electrical/fiber work ongoing.
    • Idaho Power vault needs to be lowered.
    • IP working with engineer consultant to retrofit box to meet new grades.
    • Contractor has moved east and continues to prep road base from 6th to 8th.
    • Concrete paving complete between 4th and 5th St. South side of 5th complete.
    • Power and fiber for signals nearly complete.
    • Sidewalks and ped ramp work started between 4th and 5th.
    • Landscapers to follow.
    • 8th Street electrical/fiber work ongoing.
    • Idaho Power vault needs to be lowered.
    • IP working with engineer consultant to retrofit box to meet new grades.
    • Contractor has moved east and continues to prep road base from 6th to 8th.
    • Concrete paving complete between 4th and 5th St. South side of 5th complete.
    • Power and fiber for signals nearly complete.
    • Sidewalks and ped ramp work started between 4th and 5th.
    • Landscapers to follow.

    This project is substantially complete. 

  • September 6, 2024

    Share September 6, 2024 on Facebook Share September 6, 2024 on X (formerly Twitter) Share September 6, 2024 on Linkedin Email September 6, 2024 link
    • 8th Street electrical/fiber work ongoing.
    • Idaho Power vault needs to be lowered. IP working with engineer consultant to retrofit box to meet new grades.
    • Contractor has moved east and continues to prep road base from 6th to 8th.
    • Concrete paving complete between 4th and 5th St.
    • South side of 5th will be paved on Friday September 6th.
    • Power and fiber for signals nearly complete.
    • Sidewalks and ped ramp work started between 4th and 5th. Landscapers to follow.
    • 8th Street electrical/fiber work ongoing.
    • Idaho Power vault needs to be lowered. IP working with engineer consultant to retrofit box to meet new grades.
    • Contractor has moved east and continues to prep road base from 6th to 8th.
    • Concrete paving complete between 4th and 5th St.
    • South side of 5th will be paved on Friday September 6th.
    • Power and fiber for signals nearly complete.
    • Sidewalks and ped ramp work started between 4th and 5th. Landscapers to follow.

    This project is substantially complete. 

  • August 30, 2024

    Share August 30, 2024 on Facebook Share August 30, 2024 on X (formerly Twitter) Share August 30, 2024 on Linkedin Email August 30, 2024 link
    • 8th Street electrical/fiber work ongoing.
    • Fiber swap is scheduled for the weekend of July 20th.
    • Idaho Power vault needs to be lowered. IP working with engineer consultant to retrofit box to meet new grades.
    • Contractor has moved east and continues to prep road base from 6th to 8th.
    • Concrete paving started between 4th and 5th St.
    • Power and fiber for signals ongoing.
    • 8th Street electrical/fiber work ongoing.
    • Fiber swap is scheduled for the weekend of July 20th.
    • Idaho Power vault needs to be lowered. IP working with engineer consultant to retrofit box to meet new grades.
    • Contractor has moved east and continues to prep road base from 6th to 8th.
    • Concrete paving started between 4th and 5th St.
    • Power and fiber for signals ongoing.

    This project is substantially complete. 

  • August 23, 2024

    Share August 23, 2024 on Facebook Share August 23, 2024 on X (formerly Twitter) Share August 23, 2024 on Linkedin Email August 23, 2024 link
    • 8th Street electrical/fiber work ongoing – Fiber swap is scheduled for the weekend of July 20th.
    • Idaho Power vault needs to be lowered. IP working with engineer consultant to retrofit box to meet new grades.
    • Contractor has moved east and continues to prep road base.
    • Prepping for concrete paving complete between 4th and 5th St.
    • Contractor will be paving early morning starting August 22nd between 4th and 5th St.
    • Power and fiber for signals ongoing.
    • 8th Street electrical/fiber work ongoing – Fiber swap is scheduled for the weekend of July 20th.
    • Idaho Power vault needs to be lowered. IP working with engineer consultant to retrofit box to meet new grades.
    • Contractor has moved east and continues to prep road base.
    • Prepping for concrete paving complete between 4th and 5th St.
    • Contractor will be paving early morning starting August 22nd between 4th and 5th St.
    • Power and fiber for signals ongoing.

    This project is substantially complete. 

  • August 15, 2024

    Share August 15, 2024 on Facebook Share August 15, 2024 on X (formerly Twitter) Share August 15, 2024 on Linkedin Email August 15, 2024 link
    • 8th Street electrical/fiber work ongoing.
    • Fiber swap is scheduled for the weekend of July 20th.
    • Idaho Power vault needs to be lowered. IP working with engineer consultant to retrofit box to meet new grades.
    • Contractor has moved east and continues to prep road base.
    • Prepping for concrete paving ongoing – tentatively scheduled for August 21-22nd.
    • 8th Street electrical/fiber work ongoing.
    • Fiber swap is scheduled for the weekend of July 20th.
    • Idaho Power vault needs to be lowered. IP working with engineer consultant to retrofit box to meet new grades.
    • Contractor has moved east and continues to prep road base.
    • Prepping for concrete paving ongoing – tentatively scheduled for August 21-22nd.

    This project is substantially complete. 

  • August 9, 2024

    Share August 9, 2024 on Facebook Share August 9, 2024 on X (formerly Twitter) Share August 9, 2024 on Linkedin Email August 9, 2024 link
    • 8th Street electrical/fiber work ongoing.
    • Fiber swap is scheduled for the weekend of July 20th.
    • Idaho Power vault needs to be lowered. IP working with engineer consultant to retrofit box to meet new grades.
    • Contractor has moved east and started to prep for road base while Idaho Power sorts out the vault issue on State and 8th.
    • Prepping for concrete paving ongoing.
    • 8th Street electrical/fiber work ongoing.
    • Fiber swap is scheduled for the weekend of July 20th.
    • Idaho Power vault needs to be lowered. IP working with engineer consultant to retrofit box to meet new grades.
    • Contractor has moved east and started to prep for road base while Idaho Power sorts out the vault issue on State and 8th.
    • Prepping for concrete paving ongoing.

    This project is substantially complete. 

  • August 2, 2024

    Share August 2, 2024 on Facebook Share August 2, 2024 on X (formerly Twitter) Share August 2, 2024 on Linkedin Email August 2, 2024 link
    • 8th Street electrical/fiber work ongoing – Fiber swap is scheduled for the weekend of July 20th.
    • Idaho Power vault needs to be lowered. IP working with engineer consultant to retrofit box to meet new grades.
    • Contractor has moved east and started to prep for road base while Idaho Power sorts out the vault issue on State and 8th.
    • Prepping for concrete paving ongoing.
    • 8th Street electrical/fiber work ongoing – Fiber swap is scheduled for the weekend of July 20th.
    • Idaho Power vault needs to be lowered. IP working with engineer consultant to retrofit box to meet new grades.
    • Contractor has moved east and started to prep for road base while Idaho Power sorts out the vault issue on State and 8th.
    • Prepping for concrete paving ongoing.

    This project is substantially complete. 

  • July 26, 2024

    Share July 26, 2024 on Facebook Share July 26, 2024 on X (formerly Twitter) Share July 26, 2024 on Linkedin Email July 26, 2024 link
    • Project includes work on State Street between 4th Street and 8th Street
      • 8th Street electrical/fiber work ongoing.
      • Fiber swap is scheduled for the weekend of July 20th.
      • Idaho Power vault needs to be lowered.
      • IP working with engineer consultant to retrofit box to meet new grades.
      • Contractor completed demo on State and 8th.
      • Excavation complete, on the north side, in preparation for base materials.
      • Contractor has moved east and started to prep for road base while Idaho Power sorts out the vault issue on State and 8th.
    • Project includes work on State Street between 4th Street and 8th Street
      • 8th Street electrical/fiber work ongoing.
      • Fiber swap is scheduled for the weekend of July 20th.
      • Idaho Power vault needs to be lowered.
      • IP working with engineer consultant to retrofit box to meet new grades.
      • Contractor completed demo on State and 8th.
      • Excavation complete, on the north side, in preparation for base materials.
      • Contractor has moved east and started to prep for road base while Idaho Power sorts out the vault issue on State and 8th.

    This project is substantially complete. 

  • July 19, 2024

    Share July 19, 2024 on Facebook Share July 19, 2024 on X (formerly Twitter) Share July 19, 2024 on Linkedin Email July 19, 2024 link
    • 8th Street electrical/fiber work ongoing – Fiber swap is scheduled for the weekend of July 20th.
    • Contractor completed demo on State and 8th this week.
    • Excavation started this week, on the north side, in preparation for base materials.
    • Idaho Power underground work is ongoing.
    • 8th Street electrical/fiber work ongoing – Fiber swap is scheduled for the weekend of July 20th.
    • Contractor completed demo on State and 8th this week.
    • Excavation started this week, on the north side, in preparation for base materials.
    • Idaho Power underground work is ongoing.

    This project is substantially complete.